首页/ 题库 / [多选题]计算桁架内力时,一般假设()。的答案

计算桁架内力时,一般假设()。

多选题
2022-01-06 01:12
A、桁架杆件都是直杆;
B、各杆之间的节点都是理想的光滑铰连接;
C、所有内力都作用于桁架平面内;
D、所有外力都作用于杆件中间;
E、不计杆件自重;
查看答案

正确答案
A| B| C| E

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

建筑总平面图是较大范围内的建筑群和其他工程设施的水平投影图。看懂建筑总平面图和了解建筑施工图的基本知识也是机械员进行机械施工不可缺少的内容。试问:建筑施工图一般包括施工总说明、总平面图、()、建筑详图和门窗表等。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
病例对照研究进行统计性推断时不匹配分层资料总的OR值计算公式是
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
假设(AL)=12H,执行OR AL,AL指令后,ZF和OF的—状态分别为( )。
假设(AL)=12H,执行OR AL,AL指令后,ZF和OF的一状态分别为( )。
已知A=40;B=30;C=100;D=50,逻辑“与”运算符为and,“或”运算符为or,“非”运算符为not。计算表达式(A>B+20)or(B+60<>
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
假设A=3,B=7,C=2,则表达式:(A>B)OR(B>C)的值是()
计算桁架内力时,一般假设()。
桁架的内力分析时,常做一些假设,下列假设错误的是()。
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧