首页/ 题库 / [单选题]The container is loa的答案

The container is loaded and discharged by gantry cranes.()

单选题
2022-06-30 13:00
A、集装箱由龙门吊装卸。
B、集装箱由重吊装卸。
C、集装箱由船吊装卸。
D、集装箱有岸吊装卸。
查看答案

正确答案
A

试题解析

感兴趣题目
When your vessel is on or near the path of an approaching tropical storm the().
If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
()是指普调考、技能竞赛、新员工结业考试或技能竞赛等规模较大的考试考核活动。
A c() sentence contains two or more clauses, one of which is incorporated in the other.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
The () is used for hauling in or letting out the wires or ropes.
For the purposes of cargo oil containment,the fixed container under the manifold of an eight-inch loading line must hold a minimum of().
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
The container is loaded and discharged by gantry cranes.()
During counterflooding to correct a severe list or trim aggravated by an off-center load,a ship suddenly takes a list or trim to the opposite side. You should().
相关题目
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
The drive motor will have a brake arranged to fail-safe, ieit will () the load if power fails or machine is stopped.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
The ship will be responsible for the cargo loaded or unloaded().
A ship is responsible for the cargo loaded or unloaded().
The ship will be responsible for the cargo loaded or unloaded().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
联合收割机驾驶人考试科目分为科目一:理论知识考试;科目二:田间(模拟)作业驾驶技能考试;科目三:场地驾驶技能考试;科目四:方向盘自走式联合收割机道路驾驶技能考试。()
A notice of readiness is not valid unless it indicates that the vessel is ready to load or discharge as the case may be,at the time()it is given.
考试员资格培训和考试的内容包括道路交通安全法律、法规和相关知识、廉政警示教育、计算机评判系统操作、驾驶技能和考试评判能力。
操作技能考试按考试条件可以分为()几种。
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
The important thing is that this is a major breakthrough. “breakthrough” here means an important development or achievement.
广告位招租WX:84302438