首页/ 题库 / [单选题]在合同成立时,采用数据电文形式订立合同的的答案

在合同成立时,采用数据电文形式订立合同的,合同成立地点为()。

单选题
2021-12-30 15:23
A、承诺生效的地点
B、经常居住地
C、收件人的主营业地
D、合同签订地
查看答案

正确答案
C

试题解析
根据《合同法》第34条规定,承诺生效的地点为合同成立的地点。采用数据电文形式订立合同的,收件人的主营业地为合同成立的地点;没有主营业地的,其经常居住地为合同成立的地点。当事人另有约定的,按照其约定。故C为正确选项。

相关题目
根据住房和城乡建设部《注册建造师执业管理办法》的规定,担任建设工程施工项目负责人的注册建造师应当在()相关文件上签字并加盖执业印章。
根据建设部《注册建造师执业管理办法》的规定,担任建设工程施工项目负责人的注册建造师应当在()相关文件上签字并加盖执业印章。
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

Rent, economic(or pure economic rent) 经济租或纯经济租
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧