首页/ 题库 / [单选题]When does the warran的答案

When does the warranty of the XIV Storage System start? ()

单选题
2022-01-01 11:49
A、when the order is placed
B、when the product is shipped
C、when the product is delivered
D、when the product is installed
查看答案

正确答案
D

试题解析

标签: IBM(000-119)
感兴趣题目
What is the default value for the ENABLED attribute of a job or program when it is created? ()
The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.
When the renewal verification is completed more than three months before the expiry date of the existing Document of Compliance or Safety Management Certificate, the new Document of Compliance or the new Safety Management Certificate should be valid from the date of () for a period not exceeding five years.
When the truck does not work, the driver should()engines.
Which of the following does the writer explain?
Which of the following are included with the built-in features of the IBM XIV Storage System?()
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire most likely to be mentioned?().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire mostlikely to be mentioned?().
When your vessel is on or near the path of an approaching tropical storm the().
An implied warranty of seaworthiness on the part of the vessel’s owner lies in the().
The master may bind the Shipowner or Charterer()doing such things as are necessary on the part of the one or of the other to carry out the contract.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
相关题目
第一组:When a nominated surveyor or recognized organization determines that the condition of the ship or its equipment does not correspond substantially with the particulars of the Certificate (IOPP) or is such that the ship is not fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment, such surveyor or organization shall immediately ensure that corrective action is taken and shall in due course notify the Administration. If such corrective action is not taken, the Certificate shall be withdrawn and the Administration shall be notified immediately; and if the ship is in a port of another Party, the appropriate authorities of the port State shall also be notified immediately. When an officer of the Administration, a nominated surveyor or a recognized organization has notified the appropriate authorities of the port State, the Government of the port State concerned shall give such officer, surveyor or organization any necessary assistance to carry out their obligations under this regulation. When applicable, the Government of the port State concerned shall take such steps as will ensure that the ship shall not sail until it can proceed to sea or leave the port for the purpose of proceeding to the nearest appropriate repair yard available without presenting an unreasonable threat of harm to the marine environment.Whenever an accident occurs to a ship or a defect is discovered which substantially affects the integrity of the ship or the efficiency or completeness of its equipment covered by this Annex the master or owner of the ship shall report at the earliest opportunity to the Administration, the recognized organization or the nominated surveyor responsible for issuing the relevant Certificate, who shall cause investigations to be initiated to determine whether a survey as required by paragraph 1 of this regulation is necessary. If the ship is in a port of another Party, the master or owner shall also report immediately to the appropriate authorities of the port State and the nominated surveyor or recognized organization shall ascertain that such report has been made.When a ship is found not fit to proceed to sea by a nominated surveyor, then corrective action should be taken and be informed immediately. (1)the master (2)the authorities of port State (3)the Administration
In Chinese when someone breaks a bowl or a plate the host or the people present are likely to say“碎碎(岁岁)平安”as a means of controlling the forces which they believes feel might affect their lives. Which functions does not it perform?
A sentence is not considered ____ when it does not conform to the grammatiical knowledge in the mind of native speakers
Travellers, when ____________ the checks, have to sign the checks in the presence of the bank or service clerks
What does the author think of the tour?
When does the warranty of the XIV Storage System start? ()
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
When the dew point of the outside air is lower than or equal to the dew point of the air in the cargo hold,you should().
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
A mortgagee does not acquire a right to the freight()he has taken actual or constructive possession of the ship.
How does DB2 protect the integrity of indexes when data is updated?()
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Stone does not(), and so the tools of long ago have remained when even the bones of the men who made them have disappeared without trace.
The color of the skirt does not () that of the coat.
When two hosts are trying to communicate across a network, how does the host originating the communication determine the hardware address of the host that it wants to "talk" to?()
An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()
As a watch officer when bunkering, which of the following does require his individual attention?()
The engine may lose power or slow down during running, when this occurs, the first cause possible may be hot bearings and () of the pistons in the cylinders.
广告位招租WX:84302438

免费的网站请分享给朋友吧