首页/ 题库 / [单选题]The injection may be的答案

The injection may be delayed, ()the pumps are in good order, if the fuel lines to the injection valves have not been cleared of air.

单选题
2022-01-03 17:20
A、because
B、though
C、since
D、until
查看答案

正确答案
B

试题解析

感兴趣题目
The engine may lose power or slow down during running, when this occurs, the first cause possible may be hot bearings and () of the pistons in the cylinders.
Turbocharging system may be designed to operate on either the () or the constant pressure exhaust system.
If fuel injection to a four-stroke/cycle diesel engine begins earlier than designed, ignition may be delayed because the ().
If the diesel engine fuel injection timing is changed to delay the start of injection until the pistons are at top dead center, the engine will()
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire most likely to be mentioned?().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire mostlikely to be mentioned?().
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The schedule management plan is a component of the project management plan The schedule management plan may be formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.

() are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion; they may also exert influence over the project and its results.

() are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion.

Sometimes lights are()by fog,haze,dust,smoke,or precipitation which may be present at the light,or between the light and the observer,and which is possibly unknown by the observer.
相关题目

() are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion.

If the building project __________ by the end of this month is delayed, the construction company will be fined.

为了保证船舶航行安全,首先要确定船舶的航向与位置。船舶定位方法按照参照目标可分为( )。

船舶勘绘载重线标志的目的是()。
①最大限度地利用船舶的装载能力;②保证船舶的航行安全;③保证船舶走经济航速。

下列哪些证书是《海上交通安全法》要求船舶应具备的()。
Ⅰ.客船安全证书;Ⅱ.防止油污证书;Ⅲ.船舶执照;Ⅳ.船舶国籍证书。

下列关于船舶安全检查的说法中,正确的是()。
Ⅰ、船舶接受安全检查时,陪同检查的船员引导检查人员即可
Ⅱ、船舶接受安全检查时,陪同检查的船员应按检查人员要求,调试、操纵有关设备
Ⅲ、中国籍船舶接受安全检查时出示船舶安全检查记录簿

Inquiries()the condition of the patients may be made personally or by telephone.
The port State control officer or the surveyor authorized by the port State Administration must be aware that()may be carried on product carriers.
()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited by the terms of().
The injection may be delayed, ()the pumps are in good order, if the fuel lines to the injection valves have not been cleared of air.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
() may be the first possible cause which makes the engine to lose power or slow down when it is running.
If the redelivery of a vessel is delayed by causes (),hire is payable at the charter rate until redelivery even though the market rate may have gone up or down.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Allowances may be made for the expansion and contraction in piping by the use of expansion joints or ().
Whether a ship is sailing before the wind or sailing in the rough sea, we must reduce the fuel injection of the main engine.For the former one, it aims to prevent the main engine being(), while for the later one, it aims to prevent the main engine being().
Sluggish response or action of the hydraulic actuators may be a result of ().
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
广告位招租WX:84302438

免费的网站请分享给朋友吧