首页/ 题库 / [单选题]What is a Label-Swit的答案

What is a Label-Switched Path?()

单选题
2022-03-03 21:14
A、a traffic engineered path
B、another name for a Frame Relay PVC
C、a bidirectional path through a network
D、a unidirectional path through a network
查看答案

正确答案
D

试题解析

相关题目
What does a SART signal sound or look like?()
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
Basically a robot is a machine which moves, manipulates, joins or processes _____in the same way as human hand or arm.
What is an example of the term “Restraint of Rulers,Princes,or Peoples” in a marine insurance policy? ()
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
Is a desktop or notebook size computing device 。
What provides little or no indication that a vessel is dragging anchor? ()
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
What is the default value for the ENABLED attribute of a job or program when it is created? ()
【参考范例二】Animals or Pets What is your favourite animal?
What requires a Report of Marine Accident,Injury or Death?()
( )Is red a strong color or a peaceful color?
What is an example of the term Restraint of Rulers,Princes,or Peoples in a marine insurance policy? ()
What is an example of the term Restraint of Rulers,Princes,or Peoples in a marine insurance policy?()
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
Project ______is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
 ______ twice a year, whether it is a car or a bus or a truck, is the rule that every driver must obey in this city.
广告位招租WX:84302438

免费的网站请分享给朋友吧