首页/ 题库 / [单选题]The vessel’s Load Li的答案

The vessel’s Load Line Certificate is always issued by ().

单选题
2022-03-25 21:22
A、The Register of Shipping
B、Customs House
C、Cargo Survey Bureau
D、Maritime Safety Administratio
查看答案

正确答案
A

试题解析

相关题目
When a vessel’s LCG is aft of her LCB,the vessel will().
A drift lead indicates that the vessel is dragging anchor when the line is().
法定检验检疫的人境货物,海关凭检验检疫机构签发的()验放。
Compliance with the terms of the load line certificate on a ship is the responsibility of the().
Compliance with the terms of the load line certificate on a vessel is the responsibility of the().
On a passenger vessel,the vessel’s name must appear on().
The primary purpose of a load line is to establish required().
When a vessel sees the other ahead or nearly ahead,by night she could see the masthead lights of the other in a line or nearly in a line or both side lights,()shall be deemed to exist.
某海关对李某作出罚款的行政处罚决定,李某以海关违法为由向海事法院提起行政诉讼,该海事法院应如何处理?()
Sidewise force of the propeller tends to throw a vessel’s stern to the right or left,depending on rotation. This force is caused by().
The annual survey for endorsement of a Load Line Certificate must be held within().
Keeping the draft at or below the load line mark will insure that the vessel has adequate().
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
Notice of readingness to load must be served()the charterer or his agent.
Notice of Readiness to Load must be served()the Charterer or his agent.
A notice of readiness is not valid unless it indicates that the vessel is ready to load or discharge as the case may be,at the time()it is given.
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
If there is a strike or lock-out affecting the cargo on or after vessel’s arrival at port of discharge and the same has not been settled within 48 hours,Receivers shall have the option of keeping vessel waiting until such strike or lock-out is at an end against paying half demurrage after expiration of the time prescribed for discharging or ordering the vessel to a substituting port.The “same” refers to().
Your vessel is to dock bow in at a pier without the assistance of tugboats. Which line will be the most useful when maneuvering the vessel alongside the pier?()
A current perpendicular to a vessel’s track has the greatest effect on the vessel’s course made good().
广告位招租WX:84302438

免费的网站请分享给朋友吧