依据施工合同范文本规定,()造成工期延误,经工程师确定后工期可以相应顺延

多选题
2022-04-02 12:33
A、<span style="FONT-FAMILY: 宋体;FONT-SIZE:12pt;"><font face="新宋体">工程量增加</font></span>
B、<span style="FONT-FAMILY: 宋体;FONT-SIZE:12pt;"><font face="新宋体">设计变更<span style="FONT-FAMILY: '新宋体'; FONT-SIZE: 12pt; mso-spacerun: 'yes'"><p></p></span></font></span>
C、<span style="FONT-FAMILY: 宋体;FONT-SIZE:12pt;"><font face="新宋体">合同内约定应由承包人承担的风险</font></span>
D、<span style="FONT-FAMILY: 宋体;FONT-SIZE:12pt;"><font face="新宋体">发包人不能按专用条款约定提供开工条件</font></span>
E、<span style="FONT-FAMILY: 宋体;FONT-SIZE:12pt;"><font face="新宋体">一周内非承包人原因停水,停电,停气造成停工累计超过8小时<span style="FONT-FAMILY: '新宋体'; FONT-SIZE: 12pt; mso-spacerun: 'yes'"><p></p></span></font> <!--EndFragment--></span>
查看答案

正确答案
ABDE

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

Goods are carried by several        of transport--on road or rail, by sea or air.

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
广告位招租WX:84302438

免费的网站请分享给朋友吧