首页/ 题库 / [单选题]After an explosion,r的答案

After an explosion,repair of emergency machinery and services should be accomplished().

单选题
2022-04-19 09:43
A、after control of fire,flooding,and structural repairs
B、immediately,before the emergency is under control
C、after control of fire,but before control of flooding
D、after stability is restored
查看答案

正确答案
A

试题解析

标签: 紧急通信
相关题目

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

Helping a sick neighbor with some repair work is an example of _______.
Who can tell you whether an emergency is a “disaster” or not?

Immediately after adding a new disk to or removing an existing disk from an ASM instance, you find that the performance of the database goes down initially until the time the addition or removal process is completed, and then gradually becomes normal.
Which two activities would you perform to maintain a consistent performance of the database while adding or removing disks?()

CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
The purpose of an after-cooler is to()
The air charge leaving an intercooler, or after-cooler of an air compressor can be expected to be ().
An explosion is a sudden increase in amount()
After that he knew he could any emergency by doing what be could to the best of his ability.
After that, he knew he could any emergency by doing what be could to the best of his ability.
After repair, the voyage trial of the M-E should be done ()
The loss of () from an air compressor could lead to an overheated air discharge and possibly an explosion in the pipelines leading to the air reservoir.
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
When a vessel signals her distress by means of a gun or other explosive signal,the firing should be at intervals of approximately().
The emergency generator or emergency battery is connected to() on most large ships.
Which of the listed sections of an emergency switchboard is used to supply power for alarm signals under emergency conditions?()
紧急停堆 emergency shutdown
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
If there is a strike or lock-out affecting the cargo on or after vessel’s arrival at port of discharge and the same has not been settled within 48 hours,Receivers shall have the option of keeping vessel waiting until such strike or lock-out is at an end against paying half demurrage after expiration of the time prescribed for discharging or ordering the vessel to a substituting port.The “same” refers to().
广告位招租WX:84302438

免费的网站请分享给朋友吧