首页/ 题库 / [单选题]掘进机法施工隧道工期计算分析中,除隧道正的答案

掘进机法施工隧道工期计算分析中,除隧道正洞施工工期外,还应另行考虑()、掘进机进场运输及安装调试时间。

单选题
2022-04-24 10:26
A、施工准备
B、掘进机预定
C、掘进机始发井施工
查看答案

正确答案
B

试题解析

感兴趣题目
某两车道公路隧道全长1500m,洞身为中硬岩,抗压强度150-80MPa,进出口各20m为Ⅲ类围岩。水文地质条件简单。可供选择的施工方法有:全断面隧道掘进机施工方法、矿山法施工方法中的全断面开挖法和台阶开挖法。 洞身是否可以用隧道掘进机掘进,为什么?隧道掘进机的施工方法有何特点?
可以在()阶段采用Make-or-buy决策分析。
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
某项目部承接一项直径为4.8m的隧道工程,起始里程为DKlO+100,终点里程为DKl0+868,环宽为l.2m,采用土压平衡盾构施工。盾构隧道穿越地层主要为淤泥质黏土和粉砂土。项目施工过程中发生了以下事件: 事件1:盾构始发时,发现洞门处地质情况与勘察报告不符,需改变加固形式。加固施工造成工期延误10d,增加费用30万元。 事件2:盾构侧面下穿一座房屋后,由于项目部设定的盾构土仓压力过低,造成房屋最大沉降达到50mm。穿越后房屋沉降继续发展,项目部采用二次注浆进行控制。最终房屋出现裂缝,维修费用为40万元。 事件3:随着盾构逐渐进入全断面粉砂地层,出现掘进速度明显下降现象,并且刀盘扭矩和总推力逐渐增大,最终停止盾构推进。经分析为粉砂流塑性过差引起,项目部对粉砂采取改良措施后继续推进,造成工期延误5d,费用增加25万元。 区间隧道贯通后计算出平均推进速度为8环/d。 整个隧道掘进的完成时间是多少天(写出计算过程)。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

港口与航道工程施工中,()不是工期索赔计算的分析方法。
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
已知A=40;B=30;C=100;D=50,逻辑“与”运算符为and,“或”运算符为or,“非”运算符为not。计算表达式(A>B+20)or(B+60<>
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
浅埋暗挖法施工因掘进方式不同,可分为众多的具体施工方法,下列施工工期最长的掘进方式为( )。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
掘进机法施工隧道工期计算分析中,除隧道正洞施工工期外,还应另行考虑()、掘进机进场运输及安装调试时间。
隧道工程,采用全断面掘进机施工时,下列对掘进机施工特点描述正确的是()。
盾构掘进机施工隧道的辅助功法一般有:()
盾构掘进机施工隧道的辅助工法一般有:()
隧道施工中,不用进行监测、反馈信息以指导隧道掘进的项目是()。
隧道掘进开挖时,如采用“CRD法”施工,分()步开挖。
全断面掘进机可用于多尺寸的隧道进行施工.