首页/ 题库 / [单选题]A green building is 的答案

A green building is () to have reduced its environmental impact by 60% compared with an equivalent conventional building.

单选题
2022-06-23 23:40
A、established
B、estimated
C、computed
D、counter
查看答案

正确答案
B

试题解析

标签: CMS专题
相关题目
It is said that people can ______ or deposit money from bank through facial recognition, ie, they don.t have to use a bank card.
If such a work is hundreds or thousands of years old and is still admired, there is probably something to it.
Li: hello. I. m ringing about the flat advertised in today.s star. ______? Mrs. Green: yes, it is. Two or three people have rung up about it, but nobody.s been to see it yet.
It is ______ work of art that everyone wants to have a look at it
To understand a word, you have to read all the letters in it; to understand a sentence you have to read all the words in it.()
So far we have done a lot to build a low-carbon economy, but it is________ ideal. We have to work still harder.
A vessel restricted by its ability to manoeuver by the nature of its work or its deep draft is().
What makes it difficult to build green schools in Clark County?
Developed countries, like the US, have moved the some manufactures to the developing countries. Is it true or not? ()
() you have entered your new office building, you probably would like to refurnish it.
The way to reduce () is to build up a film of lubricant between any two surfaces that rub against each other.
It is that reduce the BOD by converting the organic content of the sewage to a chemically and organically inert sludge()
It is best for people to buy food_when making‘green’ choices.
The court may reduce or deny remuneration if it appears that the salvors have by their fault ()or have been guilty of theft,receiving stolen goods,or other acts of fraud.
Assuming you build networks to exact specifications, what is the recommended maximum length a 10BaseT cable can be before it has to be segmented or repeated?()
Assuming you build networks to exact specifications, what is the recommended maximum length a 10BaseT cable can be before it has to be segmented or repeated?
There is nothing in this world constant butinconstancy. —SWIFT Project after project designs a set of algorithms and thenplunges into construction of customer-deliverable software on a schedule thatdemands delivery of the first thing built.?In most projects, the first system built is(71) usable. Itmay be too slow, too big, awkward to use, or all three. There is no (72) but to startagain, smarting but smarter, and build a redesigned version in which theseproblems are solved. The discard and (73) may be done in one lump, or it may be done piece-by-piece. But alllarge-system experience shows that it will be done. Where a new system conceptor new technology is used, one has to build a system to throw away, for eventhe best planning is not so omniscient (全知的) as to get it right the first time.The management question, therefore, is notwhether to build a pilot system and throw it away. You will do that. The onlyquestion is whether to plan in advance to build a (74) , or topromise to deliver the throwaway to customers. Seen this way, the answer ismuch clearer. Delivering that throwaway to customers buys time, but it does soonly at the (75) of agony (极大痛苦)for the user, distraction for the builders while they do theredesign, and a bad reputation for the product that the best redesign will findhard to live down.Hence plan to throw one away; you will,anyhow.(71)
There is nothing in this world constant but inconstancy.--SWIFTProject after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built.In most projects,the first system built is (71) usable,It may be too slow,too big,awkward to use,or all three.There is no (72) but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and (73) may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient(全知的)as to get it right the first time.The management question,therefore ,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a (74),or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does so only at the (75) of agony(极大痛苦)for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that best redesign will find hard to live down.Hence plan to throw one away;you will,anyhow.71.()
Any computer, be it a large PC or a small embedded computer, is useless if it has no means to interact with the outside worl
A semisubmersible which will not remain upright and will assume a list either to port or starboard is likely to have().
广告位招租WX:84302438

免费的网站请分享给朋友吧