首页/ 题库 / [单选题]当BTS收到SABM帧,它将向BSC发出的答案

当BTS收到SABM帧,它将向BSC发出一条()

单选题
2022-06-29 03:26
A、位置更新请求
B、寻呼应答
C、立即指配
D、扩展立即指配
E、建立指示
查看答案

正确答案
E

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
技术考试一般分为阶段考试和()考试。
当系统显示出错信息:Bad command or file name时,应从()方面进行检查。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
BSC收到“Assignment Request”消息,但BTS没有向MS下发“Assignment Command”消息,直接向BSC 回“Assignment Fail”消息。可能的原因是()
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
BTS软件装载流程中,为加快软件装载速度,加载时BSC连续发送()个Load_Data_Segment(数据段装载)后,BTS发送Load_Data_Segment_Ack对最后一个数据段装载进行确认,BSC收到确认消息后,再继续发送。
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
广告位招租WX:84302438

免费的网站请分享给朋友吧