首页/ 题库 / [单选题]

The()defines the的答案

The()defines the phases that connect the beginning of a project to its end.

单选题
2022-07-11 17:35
A、schedule
B、project life cycle
C、temporary
D、milestone
查看答案

正确答案
B

试题解析

相关题目

The() defines the phases that connect the beginning of a project to its end.

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

Some viruses, with no attack phase, often damage the programs or disks they infect because they .

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
In which service component of the optimize phase would you assess the routing and switching systemand recommend activities such as optimizing device configurations, capacity planning, or traffic analysis? ()
In the northern hemisphere, the largest waves or swells created by a typhoon or hurricane will be located().
● The completion and approval of one or more () characterizes a project phase.()A.deliverables B.products C.projects D.programs
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.

the goods which have entered the territory,approved by the Customs as items for which no formalities are performed in the way of duty payment,and will be reshipped out of the territory after being stored,processed or assembled in the territory are defined as ()

()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
The master may bind the Shipowner or Charterer()doing such things as are necessary on the part of the one or of the other to carry out the contract.
广告位招租WX:84302438

免费的网站请分享给朋友吧