首页/ 题库 / [单选题]某城镇的生活给水管网有时供水量不能满足供的答案

某城镇的生活给水管网有时供水量不能满足供水要求,以下所采用的措施中何项是错误的?( )

单选题
2021-07-17 23:37
A、从邻近有足够富裕供水量的城镇生活饮用水管网接管引水;
B、新建或扩建水厂;
C、从本城镇某企业自备的有足够富裕供水量的内部供水管网接管引;
D、要求本城的用水企业通过技术改造节约用水,减少用水量
查看答案

正确答案
C

试题解析

感兴趣题目
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
()are liable to be stoten, pilfered or may damaged due to improper handing or stowage.
Banks have no liability for any delay or loss caused by postal or telex failure.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
背景资料:某机电安装施工单位通过招投标竞争在某市承包一项商务楼的机电安装工程项目,工程范围包括:采暖及给水排水工程、建筑电气工程、通风与空调工程、建筑智能化工程、消防工程、电梯工程等。合同造价为1200万元。 在施工过程中,由于用户对采暖及给水排水工程中卫生器具和室内采暖系统分项工程达不到使用功能要求,向施工单位项目部提出变更设计要求。施工单位按照变更设计规定申请,在收到设计变更通知单后,进行了修改。 项目部按照规定对采暖及给水排水工程、建筑电气工程、通风与空调工程、建筑智能化工程、消防工程、电梯工程等分部、分项工程进行了评定和验收。主控项目验收有何规定?根据本案例,指出二个主控项目。
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
背景资料:某机电安装施工单位通过招投标竞争在某市承包一项商务楼的机电安装工程项目,工程范围包括:采暖及给水排水工程、建筑电气工程、通风与空调工程、建筑智能化工程、消防工程、电梯工程等。合同造价为1200万元。 在施工过程中,由于用户对采暖及给水排水工程中卫生器具和室内采暖系统分项工程达不到使用功能要求,向施工单位项目部提出变更设计要求。施工单位按照变更设计规定申请,在收到设计变更通知单后,进行了修改。 项目部按照规定对采暖及给水排水工程、建筑电气工程、通风与空调工程、建筑智能化工程、消防工程、电梯工程等分部、分项工程进行了评定和验收。指出该机电安装工程项目,划分的分部工程有哪些?
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

土木工程的范围只包括房屋建筑工程,公路与城市道路工程,铁道工程,桥梁工程,隧道工程,机场工程,地下工程,不包括给水排水工程,港口、码头工程 。( )
建筑给水排水工程整体由建筑内部给水()以及特种用途给水排水等部分组成。
建筑工程划分为地基与基础、主体结构、建筑装饰装修、建筑屋面、建筑给水排水、建筑电气、智能建筑、通风空调与采暖、电梯等九个分部工程。()
建筑给排水工程图中,给排水立面图zhuyao能够反映()。
建筑给排水工程图中,给排水立面图能够反映()。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
土木工程的范围包括房屋建筑工程、(),铁路工程,桥梁工程,隧道工程,机场工程,地下工程,给水排水工程,港口、码头工程等。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
广告位招租WX:84302438

免费的网站请分享给朋友吧