首页/ 题库 / [单选题]My cousin Nancy is o的答案

My cousin Nancy is often in a poisonous mood; I suppose it’s because she is _____child.

单选题
2021-09-01 16:19
A、one
B、a lone
C、a single
D、an only
查看答案

正确答案
D

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing
My cousin Nancy is often in a poisonous mood; I suppose it’s because she is _____child.
__________ is the act performed by or resulting from saying something; it is the consequence of, or the change brought about by the utterance.
1_____education is the instruction that occurs when the instructor and students are separated by distance or time,or both
Saving or reducing expenditure in business is ()
Saving or reducing expenditure in business is()
Saving or reducing expenditure in business is()
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
Air circulation is caused or affected by().
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
Traditionally, people gave Christmas gifts or money to their staff or servants on ()which is the day after Christmas.
翻译:With Average or With Particular Average(WA or WPA)()
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
广告位招租WX:84302438

免费的网站请分享给朋友吧