首页/ 题库 / [多选题]Which of the followi的答案

Which of the following activities is NOT a creative one according to the passage

多选题
2021-09-03 15:58
A、To prepare a meal.
B、To arrange the furniture in a peculiar way.
C、To buy some books from a bookstore.
D、To “write” a letter with the computer.
查看答案

正确答案
C@#@B@#@B@#@A@#@B

试题解析

感兴趣题目
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire most likely to be mentioned?().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire mostlikely to be mentioned?().
Which of the following is a communicative activity?
Which of the following grammar activities is most communicative?
Which of the following do not belong to the same type according to the manner or place of articulation?  
Which of the following coverage usually covers partial loss or damage resulting from natural calamities?()
Which of the following coverage usually covers partial loss or damage resulting from natural calamities?()
The ways in which words follow one another and are related to one another is called the syntagmatic dimension of language, the dimension of “chaining” or “sequencing”.()
The ways in which words follow one another and are related to one another is called the syntagmatic dimension of language, the dimension of “chaining” or “sequencing”.()
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
A technician is performing scheduled preventive maintenance on a laser printer. Which of the following should the technician clean or replace? ()
相关题目
( )estimating is a technique for estimating the duration or cost of an activity ou project using historical data from a similar activity or project.
Personnel who are moving or handling material aboard ship should NOT follow which of the listed practices?()
The ways in which words follow one another and are related to one another is called the syntagmatic dimension of language, the dimension of “chaining” or “sequencing”.()
Personnel who are moving or handling material aboard ship should NOT follow which of the listed practices?
The following terms describe various design options for Enterprise connectivity to the Internet.Which of the follow ing imply that the Enterprise connects to two or more ISPs?()
When practising sounds, the activities “using minimal pairs”, “which order”, “same or different” and “odd one out” belong to the category of ___.

PDM includes four types of dependencies or precedence relationships:().The completion ofthe successor activity depends upon the initiation of the predecessor activity.

Before starting any diesel or gasoline engine,which of the following must be checked? ()
Which of the following does not belong to the post-listening activities?

(1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.

空白(1)处填()

(1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.

空白(2)处填()

(1) is a method of constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the dependencies.This method includes following types of dependencies or precedence relationships: (2) the initiation of the successor activity, depends upon the completion ofthe predecessor activity.(3) the initiation ofthe successor activity, depends upon the initiation ofthe predecessor activity.

空白(3)处填()
Which of the following items is necessary for all waste heat boiler installations, regardless of design or manufacturer? ()
Which of the following activities would help students develop the skill of extracting specific information?
Which of the following activities would help students develop the skill of extracting specific information?
A seaman may have all or part of his wages deposited by allotment to a bank or savings institution. Which of the following is NOT a requirement for this type of allotment? ()
Which of the following statements does not belong to teaching activities?
Which of the following activities is the most suitable for group work?
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The loss of the diesel engine cylinder air charge through leaky valves, piston rings, worn or scored liners, would be indicated by which of the following sets of conditions?()