首页/ 题库 / [单选题]A mobile offshore dr的答案

A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started? ()

单选题
2021-12-31 19:25
A、When the towing vessel enters the fog
B、When the drilling rig enters the fog
C、When the towing vessel can no longer be seen from the rig
D、Immediately
查看答案

正确答案
D

试题解析

标签: 航海出版物
相关题目
underline的意思是:draw a line under to give emphasis or indicate special type
Temporary Certificates of Inspection for offshore drilling units are effective until the ().
A jack-up drilling rig being towed must().
A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started? ()
A report of casualty to a mobile offshore drilling unit must include ().
Fire protection and manning regulations for towing vessels state that the Master or person in charge must ensure that all crew members who have not participated in the drills or received the safety orientation().
If a man falls overboard from a rig under tow,you should FIRST().
An offshore drilling unit must be equipped with a first aid kit approved by the().
In securing deck loads for an ocean tow,drill pipe should be().
A jack-up drilling unit elevated on the Outer Continental Shelf must have a fog horn that will sound().
When making landfall at night,you can determine if a light is a major light or an offshore buoy by().
On offshore drilling units,emergency lighting and each emergency power system must be tested at least once a().
The knot used to join two lines or two large hawsers for towing is called a().
On offshore drilling units,each EPIRB or SART must be tested once every().
When under maneouvring conditions with the machinery being manually operated the control unit or console should be ()
When under maneuvering conditions with the machinery being manually operated the control unit or console should be
According to the regulations for mobile offshore drilling units,“industrial personnel” are considered to be all persons carried on the ship for the sole purpose of carrying out the industrial business of the unit,except for().
What must the Master or person in charge of a ship enter in the logbook after conducting a boat drill? ()
A semisubmersible rig under tow should be ballasted down if().
After conducting an abandonment drill,the Master or person in charge of a ship shall log().
广告位招租WX:84302438

免费的网站请分享给朋友吧