首页/ 题库 / [单选题]The ship()the Atlant的答案

The ship()the Atlantic to America next week.

单选题
2022-01-01 12:04
A、shall cross
B、shall cross to
C、cross
D、sail cro
查看答案

正确答案
A

试题解析

感兴趣题目
Prior to getting underway,the Master or person in charge of a ship must().
第三组:Following a security incident, in which the response measures outlined in the Ship Security Plan (SSP) have been activated, there will be a thorough review of their effectiveness and details will be made available, on request, to persons duly authorized by the Ship&39;s Flag State Administration. The Ship Security Plan is not subject to detailed inspection (other than confirming its existence on the ship) by duly authorized officials of a port State unless there are "clear grounds" to believe that the ship is not in compliance with the requirements of SOLAS or the ISPS Code, and the only means to verify or rectify the non-compliance is to review the relevant sections of the Plan. In such cases, access to the Restricted parts of the Plan relating to the non-compliance is exceptionally allowed, but only with the consent of the Flag State, or the master. If the master, in his professional judgment, believes that such "clear grounds" exist, and allowing access to relevant sections of the Restricted part of the Plan might resolve the situation, such access can be exceptionally granted. However, this should be immediately reported by the ship to the Company Security Officer (CSO). If access to the Restricted part of the Plan is denied by the master, this should be immediately reported by the ship to the Company Security Officer for guidance and reference to the Flag State.The Confidential part of a SSP cannot be subject to non-flag State inspection unless otherwise agreed by the contracting governments concerned. Any such request or demand by port state officials to view sections of the Confidential part of the Plan will be immediately reported by the ship to the Company Security Officer for guidance and reference to the flag State before any details are revealed to non-flag State officials. The Confidential provisions, which from an integral part of this Plan, are held by the Ship Security Officer (SSO)After a security incident, the revision of the SSP will made by____.
If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
The goal, which they are unlikely to live to see , is tocure, prevent or manage all diseasesin the next 80or so years.
Whenever visible traces of oil are observed on or below the surface of the water in the immediate vicinity of ship or its wake,Governments of Parties to the Convention should,to the extent they are reasonably able to do so,promptly()the facts bearing on the issue of whether there has been a violation of the provisions of this Regulation or Regulation 10 of this Annex of MARPOL 73/78.
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
Chemical Tankers are generally referred to the cargo ships constructed or adapted and used for the carriage of().
In deciding to detain a ship or not, the PSCO would better not()
When a tug is pulling on a hawser at right angles to the ship,and the pilot wants to come ahead or astern on the ship’s engine,care must be taken that the pilot().
相关题目
第一组:When a nominated surveyor or recognized organization determines that the condition of the ship or its equipment does not correspond substantially with the particulars of the Certificate (IOPP) or is such that the ship is not fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment, such surveyor or organization shall immediately ensure that corrective action is taken and shall in due course notify the Administration. If such corrective action is not taken, the Certificate shall be withdrawn and the Administration shall be notified immediately; and if the ship is in a port of another Party, the appropriate authorities of the port State shall also be notified immediately. When an officer of the Administration, a nominated surveyor or a recognized organization has notified the appropriate authorities of the port State, the Government of the port State concerned shall give such officer, surveyor or organization any necessary assistance to carry out their obligations under this regulation. When applicable, the Government of the port State concerned shall take such steps as will ensure that the ship shall not sail until it can proceed to sea or leave the port for the purpose of proceeding to the nearest appropriate repair yard available without presenting an unreasonable threat of harm to the marine environment.Whenever an accident occurs to a ship or a defect is discovered which substantially affects the integrity of the ship or the efficiency or completeness of its equipment covered by this Annex the master or owner of the ship shall report at the earliest opportunity to the Administration, the recognized organization or the nominated surveyor responsible for issuing the relevant Certificate, who shall cause investigations to be initiated to determine whether a survey as required by paragraph 1 of this regulation is necessary. If the ship is in a port of another Party, the master or owner shall also report immediately to the appropriate authorities of the port State and the nominated surveyor or recognized organization shall ascertain that such report has been made.When a ship is found not fit to proceed to sea by a nominated surveyor, then corrective action should be taken and be informed immediately. (1)the master (2)the authorities of port State (3)the Administration
______ the Atlantic Ocean crosses the equator, the trade winds cause a flow of water to the west.
The word “critical” in the sentence “This is a critical period as any loss of propulsion, or steering, can lead to collision, grounding, or other damage to the ship” can be best replaced by ().
In deciding to detain a ship or not, the PSCO would better not()
The ship()the Atlantic to America next week.
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
A mortgagee does not acquire a right to the freight()he has taken actual or constructive possession of the ship.
Which current is responsible for the movement of icebergs into the North Atlantic shipping lanes().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
M. V. Utopia ________ the Atlantic to England next month
The emergency generator or emergency battery is connected to() on most large ships.
The Charterers shall have the privilege to ship dangerous cargo in accordance with()Code or any competent authorities’ regulations,as applicable.
The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.
According to SOLAS, 1974, as amended, the shipowner or any person who has assumed responsibility for the ship (the “Company”) must()
The displacement of a ship is to the total weight, all told, of the relevant loaded ship()
In order to communicate the threat at a port facility or for a ship, the Contracting Government will set the appropriate security levels Security level 1 corresponds to()
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
It is the responsibility of the Master or person in charge of a ship to ensure that().
The Master or person in charge of a ship is required to log().
It is the responsibility of the Master or person in charge of a ship to ensure that().
广告位招租WX:84302438

免费的网站请分享给朋友吧