试题(73)Tool for defining activities is(73).(73)

单选题
2022-01-03 19:43
A、Dependency Determination
B、Precedence Diagramming method
C、Rolling Wave Planning
D、Schedule network Templates
查看答案

正确答案
C

试题解析
试题(73)分析用于定义活动的工具/方法是?选项A是依赖关系确定法,选项B是前紧关系绘图法,选项C是滚动式规划,选项D是进度网络模板。其中A、B、D是活动排序的方法和工具。因此,正确答案是C。参考答案(73)C

标签:
相关题目
73 China is _______ the Great Wall
φ73mmTBG,φ73mmUPTBG,φ73IF和φ73mmIFCH这4种单流阀是根据()分的类。
● An example of scope verification is (73).
An example of scope verification is __(73)__ .
● The most important program on any computer is (73) .(73)
The most important program on any computer is (73) .
● C++ is used with proper (73) design techniques.(73)
C++ is used with proper(73)design techniques.
● (73) is one of the techniques used for estimating activity durations.(73)
Cost of qunlity is (73)
The transmission media used t0 build a LAN is(73).
● Stack is quite simple. Many computer systems have stacks built into their circuitry. They also have machine-level instructions to operate the hardware stack. Stack is (73)in computer systems.(73)
● (73)testing is the responsibility ofthe programmer, who knows exactly what is going on inside the program.(73)
● (73) is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist betweenthem.(73)
● (73) are essential for the protection of data.(73)
●Unit testing refers to that each (73) is tested to ensure that it operates correctly.(73)
●In the following,which is not a method for inter-process communication? (73)
Tool for defining activities is( ).
试题(73)Tool for defining activities is(73).(73)
● __(73)__ are the four major activities of software configuration management.
广告位招租WX:84302438

免费的网站请分享给朋友吧