首页/ 题库 / [单选题]The Consignee will t的答案

The Consignee will take it for()that the shortage is true.

单选题
2022-01-04 04:33
A、grant
B、granting
C、granted
D、grant
查看答案

正确答案
C

试题解析

标签: 光船租船合同
感兴趣题目
Passage ThreeTrees should only be pruned (修剪) when there is a good reason for doing so. Many gardeners believe that more damage results from doing it unnecessarily than from leaving the tree to grow in its own way.First, pruning may be done to make sure that trees have a desired shape. The object may be to get a tree of the right height, and to help the growth of small side branches which will thicken its appearance or give it a special shape. Secondly, pruning may be done to make the tree healthier. You may cut out diseased or dead wood, or branches that are rubbing against each other and thus causing wounds. A tree may grow healthier by removing the branches that are locking up the centre and so preventing the free movement of air.One result of pruning is that an open wound is left on the tree and this provides an easy entry (进入) for diseases, but it is a wound that will heal. Often there is a race between the healing and the disease as to whether the tree will live or die. Pruning is usually clone in winter, for then you can see the shape of the tree clearly without the interference from the leaves.41. According to the article, which of the following statement is NOT true?
It must never be forgotten()the master has no authority to take extraordinary measures for the cargo owner if the latter or his representative can be communicated with.
It will take us a whole day to finish the ()work.
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
The () in the injector will lift at a pre-set pressure which ensures that the fuel will atomize once it enters the cylinder.
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
The United Nations is no stronger than the collective will of the nations that support it.()
It is clear that they wanted the horses to take them to the mountains.
For the following question, enter your answer in the box.
  How many 8-inch squares will it take to file a rectangular floor that measures 18 feet by 24 feet?
If the Sellers anticipate that,notwithstanding the exercise of due diligence by them,the Vessel will not be ready for delivery by the canceling date they may notify the Buyers in writing()stating the date when they anticipate that the Vessel will be ready for delivery.
相关题目
The stone was so heavy that it was difficult for the old man to ( ) it.
It's said that the weather will ( ) hot for another three or four days.
Any loss or damage noticed when the goods are delivered must be reported to the ___at the time, otherwise he will not be liable for it.
It\'s said that the weather will ( ) hot for another three or four days.
It has been held that the Shipowner will be liable for the loss of or damage to the goods even if this is due to excepted perils,unless he can prove that he has()proper care of them whilst they were in his custody.
Money is the key ________for me to decide whether I will take the job or not.
Its my advice that she ____ right now, or she might be late for the plane:( )。
It is usually decided by the()terms whether the shipper or the consignee pays for the cargo insurance.
It is hoped that the weather will()warm for three more days.
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
The ship will be responsible for the cargo loaded or unloaded().
The ship will be responsible for the cargo loaded or unloaded().
The Consignee will take it for()that the shortage is true.
Keeping the draft at or below the load line mark will insure that the vessel has adequate().
Project Quality Management processes include all the activities of the ( )that determine quality policies, objectives and responsibilities so that the project will satisfy the needs for which it was undertaken.
Project Quality Management processes include all the activities of the(71)that determine quality policies, objectives and responsibilities so that the project will satisfy the needs for which it was undertaken.
Project Quality Management processes include all the activities of the (75) that determine quality policies, objectives and responsibilities so that the project will satisfy the needs for which it was undertaken.

Project Quality Management processes include all the activities of the()that determine quality policies, objectives and responsibilities so that the project will satisfy theneeds for which it was undertaken.

● Project Quality Management processes include all the activities of the (71) that determine quality policies, objectives and responsibilities so that the project will satisfy the needs for which it was undertaken.(71)
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
广告位招租WX:84302438

免费的网站请分享给朋友吧