● Categories of risk response are (72).(72)

单选题
2022-01-04 11:25
A、Identification, quantification, response development, and response control
B、Marketing, technical, financial, and human
C、Avoidance, retention, control, and deflection
D、Avoidance, mitigation, acceptance, and Transferring
查看答案

正确答案
D

试题解析

标签:
感兴趣题目
setting redundant components in subsystem to handle with the risks brought by the defaults of original components,what kind of risk response strategy is this?()
Setting redundant components in subsystem to handle with the risks brought by the defaults of original components, what kind of risk response strategy is this ? ( 75 ).
Like personal computers, most workstations are(72)computers
Input data from keyboard are stored in(72)for processing.
The maximum number of data that can be expressed by 8 bits is(72).(72)
Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the( )
Which of the following are data layer categories to be displayed on ECDIS().
Among the basic categories of equipment, which of the following are used to convert mechanical into hydraulic energy?()
Results of quality control measurement are used (72).
● The (72) is a collection of modules serving as interface between hardware and software to provide a software platform.(72)
There are strategies typically deal with threats or risk that may have negative impacts on project objectives if they occur, some other strategies are suggested to deal with risks with potentially positive impacts. ()is a risk response strategy that may be adopted for either threats or opportunities.
● Many useful tools and techniques are used in developing schedule. (72) is a schedule network analysis technique that modifies the project schedule to account for limited resource.(72)
相关题目
根据Credit Risk+模型,假设某贷款组合由100笔贷款组成,该组合的平均违约率为2%,E=2.72,则该组合发生4笔贷款违约的概率为(  )
●The smallest physical units on a hard disk are called (72) .
The smallest physical units on a hard disk are called(72).
● The process of software development doesn’t include(72) .(72)
● The inputs of developing project management plan do not include (72).(72)
●Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the (73).
●In the following, the input device is _(72) .(72)
●In the following, the input device is (72) .(72)

The strategies for handling risk comprise of two main types: negative risks, and positive risks. The goal ofthe plan is to minimize threats and maximize opportunities. When dealing with negative risks, there are three main response strategies(),rransfer ,Mitigate.

The strategies for handling risk comprise of two main types:negative risks, and positive risks.The goal of the plan is to minimize threats and maximize opportunities.When dealing with negative risks,there are three main response strategies( ),Transfer ,Mitigate .
The strategies for handling risk comprise of two main types: negative risks, and positive risks. The goal Of the plan is to minimize threats and maximize opportunities. When dealing with negative risks,there are three main response strategies______,Transfer, Mitigate.
● Data items are added or deleted from the list only at the top of the (72) .(72)
●Several risk response strategies are available.(75) the risk simply gives another party responsibility for its management,it does not eliminate risk.
Several risk response strategies are available. ( ) the risk simply gives another party responsibility for its management,it does not eliminate risk.
●A _(72) is a collection of projects and other work that are grouped together to facilitate effective management of that work to meet strategic business objectives.

setting redundant components in subsystem to handle with the risks brought by the defaults of original components,what kind of risk response strategy is this?()

Categories of risk response are ______.
● Categories of risk response are (72).(72)
● The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned ,designed and built in, not (72 ).(72)
● The basic unit of measure in a computer system is the(72). It is the smallest unit in computing. There are some other measures in a computer, such as Kilobyte, Megabyte, Gigabyte and so on.(72)