Moving of an anchor over the sea bottom to control the movement of the vessel defines().

单选题
2022-01-05 09:20
A、dredging ( of anchor )
B、dragging ( of anchor )
C、weighing anchor
D、walking out anchor
查看答案

正确答案
A

试题解析

相关题目
It has a total length of 49968 km, of which 35578 km will be built over the sea回答
Over the past decades, sea ice in the Arctic(北极) as a result of global warming
The holding power of an anchor at a given scope of cable increases when the().
THE MASTER OR AN OFFICER SHOULD HANDING OVER THE WATCH SHOULD SAY().
The last of an anchor cable is usually painted().
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
When weighing anchor in a rough sea,how would you avoid risk of damaging the bow plating ().
Over the past decades, sea icein the Arctic as a result of global warming.
An emergency sea anchor may be constructed by using().
Thirty-five percent of the breaking strength of an anchor cable is generally accepted as the().
The purpose of the GMDSS is to()safety of life and property at sea all over the world.
Moving of an anchor over the sea bottom to control the movement of the vessel defines().
MOVING OF AN ANCHOR OVER THE SEA BOTTOM INVOLUNTARILY BECAUSE IT IS NO LONGER PREVENTING THE MOVEMENT OF THE VESSEL defines().
The average height of the surface of the sea for all stages of the tide over a 19 year period is called().
Moving of an anchor over the sea bottom involuntarily because it is no longer preventing the movement of the vessel defines().
()means a document which evidences a contract of carriage by sea and the taking over or loading of the goods by the carrier,and by which the carrier under takes to deliver the goods against surround of the document.
The purpose of the tripping line on a sea anchor is to().
The purpose of storm oil in a sea anchor is to().
The process of waiting a period of time before pretensioning an anchor is known as().
The holding capability of an anchor is primarily determined by the().