首页/ 题库 / [单选题]In reference to the 的答案

In reference to the P1R3 show isis route output, which statement is true? ()

单选题
2022-01-05 23:11
A、P1R1 is the exi t point out of the area for P1R3.
B、P1R1 is a level - 1 only IS - IS router.
C、P1R1 has been configured with a nondefault IS - IS metric.
D、P1R3 is a level - 2 only IS - IS router.
E、P1R3has been configured with a nondefault IS - IS metric.
F、P1R3 routing ta ble should contain i L2 entries.
查看答案

正确答案
A

试题解析

标签: CCNP(642-902)
相关题目
What does the underlined word “it” in the last paragraph refer to?( )
In the above quoted lines, “the Lamb ” refers to____.
In the second line ‘the unconquerable will’ refers to the will of ().
In English Poetry the phrase ‘the deep’ is often referred to ()
In the statement“—oh,God! would you like to live with your soul in the grave?” the term“soul” apparently refers to ___.
According to Hedge, a connotative meaning of a word refers to ‘the ___ or emotions of a language user in choosing a word and the influence of these on the listener’s or reader’s ___ of the word’
The payment proportionate to the part of the voyage accomplished or to the part of the cargo delivered is referred as().
What does“the days”in Paragraph 3 refer to?
The underlined words “the evicted fish” in Paragraph 3 refer to .
What does the word “this” underlined in the third paragraph refer to?
58 . What does “to do that” refer to in the second paragraph?
What does the underlined words "the other" in paragraph 2 refer to?
The underlined word “they” in the last paragraph refers to 。
The steering oar in a lifeboat is usually referred to as the().
is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.
( )is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.
● (73) is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist betweenthem.(73)
The word 'company' in the first paragraph refers to __.
The underline word “it” in the second paragraph refers to “ ” .
The certificate of a Lloyd’s surveyor()likely to be accepted by the court as conclusive to show that the carrier has exercised due diligence when it relates to a case in which he has built or bought a vessel in the first instance.
广告位招租WX:84302438

免费的网站请分享给朋友吧