首页/ 题库 / [单选题]What is not accepted的答案

What is not accepted as the required shipping paperson a manned and loaded tank barge?().

单选题
2022-03-02 17:40
A、Bill of lading
B、Manifest
C、Shipping document
D、Logbook entry
查看答案

正确答案
D

试题解析

相关题目
Anything you do is accepted as long as it’s not interfering ________ our teaching activities.
( )is accepted as true often is relatively, and not absolutely, true.
In which country the physical contact is not acceptable?
In which country the physical contact is not acceptable?
His bedroom is not as clean as Bob.s.
What is NOT a requirement for testing the line throwing appliance on a vessel? ()
During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised ( )are necessary.
During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised(75)are necessary.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
People do not agree with each other as to what is the ____ role of government.
A requirement is simplya statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called _( )_.
Which of following physical abilities is not required as to the routine movement around a vessel?()
A notice of readiness is not valid unless it indicates that the vessel is ready to load or discharge as the case may be,at the time()it is given.
Wat is NOT required in the radiotelephone log?()
Which item is NOT required to be marked with the vessel’s name().
Which is NOT a required entry in the ship’s Official Logbook?()
The required fireman’s outfits required for ship’s are not to be used for any other purpose EXCEPT for the().
What is NOT required on an uninspected towing vessel? ()
As long as the vessel is capable of performing the service immediately required,hire will ().
What will be accepted as the shipping papers for an unmanned tank barge but will not be accepted if the tank barge is manned?().
广告位招租WX:84302438

免费的网站请分享给朋友吧