首页/ 题库 / [单选题]Take the time to()th的答案

Take the time to()the validity of an offer.

单选题
2022-03-03 19:48
A、check out
B、look out
C、make out
D、pick out
查看答案

正确答案
A

试题解析

标签: CMS专题
感兴趣题目
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire most likely to be mentioned?().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire mostlikely to be mentioned?().
Take the time to()the validity of an offer.
The consignee’s refusal to take delivery,or failure to do so within a reasonable time,also puts an end to()liability as a carrier.
A ship with the TCG off the longitudinal centerline inclines to an angle of().
After an IOPP Certificate is issued to an inspected vessel,how many other surveys of the vessel’s pollution prevention equipment are conducted during the period of validity of the certificate?()
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
If necessary to avoid collision or allow more time to()the situation,a vessel shall slacken her speed or take all way off by stopping or reversing her means of propulsion.
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
In the case of an injury causing a person to be incapacitated,the Master or person in charge of a mobile offshore drilling unit must submit a report to the().
During the watch keeping at sea, the engineer in charge should notify in the event of any serious occurrence or a situation where he is unsure of the action to take()
The () is used to measure the volume of a liquid or gas through a pipeline within any given period of time.
相关题目

If I take the time to talk with my manager at the beginning of a project, we ______ off to a great start on the same page.

第一组:When a nominated surveyor or recognized organization determines that the condition of the ship or its equipment does not correspond substantially with the particulars of the Certificate (IOPP) or is such that the ship is not fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment, such surveyor or organization shall immediately ensure that corrective action is taken and shall in due course notify the Administration. If such corrective action is not taken, the Certificate shall be withdrawn and the Administration shall be notified immediately; and if the ship is in a port of another Party, the appropriate authorities of the port State shall also be notified immediately. When an officer of the Administration, a nominated surveyor or a recognized organization has notified the appropriate authorities of the port State, the Government of the port State concerned shall give such officer, surveyor or organization any necessary assistance to carry out their obligations under this regulation. When applicable, the Government of the port State concerned shall take such steps as will ensure that the ship shall not sail until it can proceed to sea or leave the port for the purpose of proceeding to the nearest appropriate repair yard available without presenting an unreasonable threat of harm to the marine environment.Whenever an accident occurs to a ship or a defect is discovered which substantially affects the integrity of the ship or the efficiency or completeness of its equipment covered by this Annex the master or owner of the ship shall report at the earliest opportunity to the Administration, the recognized organization or the nominated surveyor responsible for issuing the relevant Certificate, who shall cause investigations to be initiated to determine whether a survey as required by paragraph 1 of this regulation is necessary. If the ship is in a port of another Party, the master or owner shall also report immediately to the appropriate authorities of the port State and the nominated surveyor or recognized organization shall ascertain that such report has been made.When a ship is found not fit to proceed to sea by a nominated surveyor, then corrective action should be taken and be informed immediately. (1)the master (2)the authorities of port State (3)the Administration

When the system upon which a transport entity is running fails and subsequently restarts,the(21) information of all active connections is lost. The affected connections become half-open, as the side that did not fail does not yet realize the problem.The still active side of a half-open connections can close the connection using a(22)timer. This timer measures the time the transport machine will continue to await an (23) of a transmitted segment after the segment has been retransmitted the maximum number of times.When the timer (24),the transport entity assumes that either the other transport entity or the intervening network has failed. As a result, the timer closes the connection, and signals an abnormal close to the TS user. In the event that a transport entity fails and quickly restarts, half-open connections can be terminated more quickly by the use of the RST segment, the failed side returns an RST i to every segment i that it receives. When the RST i reaches the other side, it must be checked for validity based on the (25) number i, as the RST could be in response to an old segment. If the reset is valid, the transport entity performs an abnormal termination.

空白处(25)应选择()
The payment proportionate to the part of the voyage accomplished or to the part of the cargo delivered is referred as().
Which of the addresses below is an example of a valid unicast address?()

Immediately after adding a new disk to or removing an existing disk from an ASM instance, you find that the performance of the database goes down initially until the time the addition or removal process is completed, and then gradually becomes normal.
Which two activities would you perform to maintain a consistent performance of the database while adding or removing disks?()

Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
The bill of lading cannot vary or add to the terms of the charter-party unless it()an express provision to that effect.

If I take the time to talk with my manager at the beginning of a project, we ______ off to a great start on the same page.

If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
The invariable result of()average is that the loss falls on the owner of the particular property which has suffered the damage,whether that damage was due to deliberate sacrifice or to an accident.
CSMA,although more efficient than ALOHA or slotted ALOHA,still has one glaring inefficiency.If the medium is busy,the station will wait for a random amount of time. When two frames collide,the medium remains ( ) for the duration of transmission of both damaged frames. The use of random delays reduces the probability of( ). For( )frames,compared to propagation time,the amount of wasted capacity can be considerable.This waste can be reduced if a station continues to listen to the medium while( ).The maximum utilization depends on the length of the frame and on the( ) time; the longer the frames or the shorter the propagation time,the higher the utilization..
We find ()necessary to stress the importance of making punctual shipment within the validity of the L/C.
To make sure of getting the full advantage of a favorable current,you should reach an entrance or strait at what time in relation to the predicted time of the favorable current?()
The pilot turned engine () and is ready to take off.
A notice of readiness is not valid unless it indicates that the vessel is ready to load or discharge as the case may be,at the time()it is given.
If there is a strike or lock-out affecting the cargo on or after vessel’s arrival at port of discharge and the same has not been settled within 48 hours,Receivers shall have the option of keeping vessel waiting until such strike or lock-out is at an end against paying half demurrage after expiration of the time prescribed for discharging or ordering the vessel to a substituting port.The “same” refers to().
The consignee’s refusal to take delivery,or failure to do so within a reasonable time,also puts an end to()liability as a carrier.
广告位招租WX:84302438

免费的网站请分享给朋友吧