首页/ 题库 / [单选题]Changes may be reque的答案

Changes may be requested by any stakeholder involved with the project, but changes can be authorized only by ( ).

单选题
2022-03-16 05:44
A、executive IT manager
B、project manger
C、change control board
D、project sponsor
查看答案

正确答案
C

试题解析
项目变更可以由IT经理executive IT manager、项目管理者project manager、项目发起人project sponsor等任意项目干系人发起,但只有变更控制委员会change control board授权通过,所以选C。

标签:
相关题目
The need for insulation cleaning may be determined by ()
The change in trim of a vessel may be found by().
We regret to ________ that it may not be possible to deal with every request.

Changes may be requested by any stakeholder involved with the project, but changes can be authorized only by()

Chronometer error may be found by().
A fiber rope can be ruined by dampness because it may().
A hydraulic motor may be driven by ().
Hearing problems may be alleviated by changes in diet and exercise habits.
Electrical failures in motors are caused by the breakdown of insulation, which may be caused by ()
By observing the behavior. of animals, scientists may be able to
Progressive flooding may be indicated by().
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited by the terms of().
Fire may be spread by which means?().
Triethylene glycol fires may be extinguished by().
If an inflatable liferaft is overturned,it may be righted by().
Static electricity may be built up by the().
Initial stability of a vessel may be improved by().
Error may be introduced into a magnetic compass by().
A fire may be spread by which of the following means?()
An icebreaker may use the code letter “K” to remind ships of their obligation to listen continuously on their radio. This signal may be made by any of the following EXCEPT().
广告位招租WX:84302438

免费的网站请分享给朋友吧