首页
题目
TAGS
首页
/
题库
/
[单选题]In ship construction的答案
搜答案
In ship construction,bulkheads in the quarters are generally().
单选题
2022-05-21 00:28
A、structural
B、watertight
C、non-structural
D、continuou
查看答案
正确答案
C
试题解析
标签:
船舶结构基本知识
感兴趣题目
It is the responsibility of the Master or person in charge of a ship to ensure that().
The Master or person in charge of a ship is required to log().
It is the responsibility of the Master or person in charge of a ship to ensure that().
After conducting an abandonment drill,the Master or person in charge of a ship shall log().
Prior to getting underway,the Master or person in charge of a ship must().
In ship construction,bulkheads in the quarters are generally().
In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().
()means the sufficiency of a vessel in materials,construction,equipment,crew,and outfit for the trade or service in which it is employed.
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
Chemical Tankers are generally referred to the cargo ships constructed or adapted and used for the carriage of().
In deciding to detain a ship or not, the PSCO would better not()
相关题目
The shipment time is June or July at our __ and the goods will be shipped in one __
In the past 30 years China ______ great advances in the socialist revolution and socialist construction
After()the bid, major construction began in Beijing.
In deciding to detain a ship or not, the PSCO would better not()
In vessel construction,a greater number of watertight bulkheads results in().
International Code for the Construction and Equipment of Ships Carrying Liquefied Gases in Bulk (IGC Code) is a part of()
International Code for the Construction and Equipment of Ships Carrying Liquefied Gases in Bulk (IGC Code) of______.
The shipment time is June or July atour()and the good swill be shipped in one().
In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
When receiving a distress alert, the SAR authorities ashore and the ships in the vicinity of the ship in distress will()soonest.
When receiving a distress alert, the SAR authorities ashore and the ships in the vicinity of the ship in distress will()in a coordinated search and rescue operation with the minimum delay.
When receiving a distress alert, the SAR authorities ashore and the ships in the vicinity of the ship in distress will()in a coordinated search and rescue operation with the minimum delay.
The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.
The purpose of sheer in ship construction is to().
A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().
What must the Master or person in charge of a ship enter in the logbook after conducting a boat drill? ()
The Master or person in charge of a ship shall ensure the crane record book shows the().
When receiving a distress alert, the SAR authorities ashore and the ships in the vicinity of the ship in distress will()soonest.
All accidents and damage to ship,equipment or personnel,must be()in the vessel deck log.
广告位招租WX:84302438
题库考试答案搜索网
免费的网站请分享给朋友吧