首页/ 题库 / [单选题]When a cargo boom or的答案

When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().

单选题
2022-05-21 09:28
A、winch speed
B、boom strength
C、load radius
D、cable strength
查看答案

正确答案
C

试题解析

感兴趣题目
0n a crane ,the boom indicator tells the operator what angle the boom angle is compared to the().
Project(71)is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
Project ______is an uncertain event or condition that,if it occurs,has a positive or a negative effect on at least one project objective,such as time,cost,scope,or quality.
● Project(71)is an uncertain event or condition that, if it occurs, has a positive or a negative effect on at least one project objective, such as time, cost, scope, or quality.(71)
A declaration made by the Master before a PRC Consul,giving particulars regarding heavy weather or other incidents which may have caused damage to the vessel or cargo,through no fault of the vessel,her officers,or crew is a(n)().
A ()can give power to hoist or lower cargo.
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
Except as provided for otherwise,an oil tanker might discharge certain amount at certain rate of oil or oily mixtures into sea when().
An oil tanker,except as provided for otherwise,might discharge certain amount at certain rate of oil or oily mixtures into sea when().
A mark or place at which a vessel comes under obligatory entry,transit,or escort procedure is know as().
Damage to cargo caused by fumes or vapors from liquids,gases,or solids is known as().
相关题目
调动正在装卸作业的车辆,必须事先通知监装卸货运员停止作业,整理好车内货物防止倒塌,棚车关好车窗,人员全部离开作业车,()防护信号后方可进行。
What is/are the advantage(s)of cranes over conventional cargo booms().
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
When possible,what should be the FIRST step in combating a fire on deck resulting from a cargo overflow or a leaking cargo line?()
Damage to cargo caused by fumes or vapor from liquids,gases, or solids is known as().
()cargo means to check all cargo loaded into or discharged from a vessel.
When rigging a bosun’s chair,a tail block or lizard is used to().
If the redelivery of a vessel is delayed by causes (),hire is payable at the charter rate until redelivery even though the market rate may have gone up or down.
When making landfall at night,you can determine if a light is a major light or an offshore buoy by().
A ship is responsible for the cargo loaded or unloaded().
After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or().
Securing cargo by running timbers from an upper support down to the cargo,either vertically or at an angle,is called().
In a general cargo crane, () is fitted to raise or lower the jib.
When carrying a cargo of asphalt or molten sulfur,which are carried at temperatures of over 300°F,one of the biggest dangers is().
If there is a strike or lock-out affecting the cargo on or after vessel’s arrival at port of discharge and the same has not been settled within 48 hours,Receivers shall have the option of keeping vessel waiting until such strike or lock-out is at an end against paying half demurrage after expiration of the time prescribed for discharging or ordering the vessel to a substituting port.The “same” refers to().
Mousing a cargo hook with marline or small line().
A ship can request completion of a () when the ship is at a higher security level than the port facility or another ship it is interfacing with.
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire most likely to be mentioned?().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire mostlikely to be mentioned?().
Suppose the rated capacity of the main engine of a ship is 10,000 KW at 100 rated rpm, then when at 80 rpm its capacity should be ().
广告位招租WX:84302438

免费的网站请分享给朋友吧