首页/ 题库 / [单选题]from one phase are u的答案

from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.

单选题
2022-05-21 10:47
A、Process
B、Milestone
C、Work
D、Deliverables
查看答案

正确答案
D

试题解析
解析:一个阶段所产生的可交付物通常要在开始下一阶段的工作之前对其完备性和正确性进行评审并获得批准。

标签:
感兴趣题目
Fires resulting from spontaneous combustion are usually caused by the improper disposal of().
Lube oil pumps taking suction from the sump of most small marine engines are usually ().
In the production of freshwater from seawater through a process of heating and cooling, the cooling phase of production is usually called ().
from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.
( ) from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.
● (66) from one phase are usually reviewed for completeness and accuracyand approved before work starts on the next phase.
Longitudinal and transverse separtions between the tanks,which are used to prevent liquids from leaking from one double bottom tank into the other ,are called().
● (75) Development is a structured design methodology that proceeds in a sequence from one phase to the next.(75)
Development is a structured design methodology that proceeds in a sequence from one phase to the next.
Although the parties are entitled to make their contract in any manner that they like,it is usual for them to adopt one of the standard forms and then()it as they think fit.
The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycleIt is().
An administrator attends a management meeting to further explain a problem that occurred Several weeks ago. A quick review of existing log files reveals that all logs from that period are gone.  Which logfile may be reviewed for specific event detail at this late date?()
相关题目

()from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.

There are various languages for humans, whereas(然而)there is only one programming language for computer.
二、词汇语法题(每空1分,共20分)
Directions: There are 20 incomplete sentences in this section. For each sentence there are four choices marked A, B, C and D. choose one answer that best completes the sentence.
It is easy to ( )one state of matter from another.
二、词汇语法题(每空1分,共20分)
Directions: There are 20 incomplete sentences in this section. For each sentence there are four choices marked A, B, C and D. choose one answer that best completes the sentence.
It is easy to ( )one state of matter from another.
If you are for an increase, ask for a reason and another review in six months.
Instructions for training of new seamen are usually found in().
As usual,we are going to insure against()for 110% of the invoice value.
“YouandMe,From one world,We are family.Travel dream,At hous and miles,Meet-ing in Beijing.Come to get her,Put your handin mine.You and Me,From one world.We are family.“《You and Me》这首歌词,主要揭示了().
When whistle signals are used for launching lifeboats,one short blast means().
With a purely () load the voltage and current are in phase, giving a power factor of one.
The lubricating system for the cylinder walls is different from the bearings in that the oil for former one is supplied in () while that for latter one is ().
Input data from keyboard are stored in(72)for processing.
() are two vertical supports,usually steel,one each side of the centerline of the ship used to support booms.
Two tugs are helping the ship. One is pulling from forward, the other is ().
The exchange rates are hard to establish sometimes because more than two countries usually trade with one another.
The goals for secondary education are()from those for higher education.
The mere fact that we are on a one-to-one basis for 3 hours each day, four days a week for 8 weeks, means that _____ the lessons are very intensive.
For safety, all passengers are required to review this card and follow these instructions when needed.

() from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.

Conditions for crossing a rough bar are usually best at ().
广告位招租WX:84302438

免费的网站请分享给朋友吧