首页/ 题库 / [单选题]You must be very ( 的答案

You must be very ( ) not to say anything to John.

单选题
2021-09-01 23:51
A、care
B、careful
C、careless
D、carefully
查看答案

正确答案
B

试题解析

相关题目
On a ship,a fixed carbon dioxide or other approved system must be installed().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
_ _ energy under the earth must be released in one form or another, for example, an earthquake.
Before starting any diesel or gasoline engine,which of the following must be checked? ()
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
In the northern hemisphere, the largest waves or swells created by a typhoon or hurricane will be located().
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
For a sacrifice or expenditure to be the subject of general average contribution,there must be a danger common to().
When welding or burning aboard a vessel, you must be certain that the space ().
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
If you must enter a room or compartment to combat the fire, keep an escape path ().
Sooner or later good must()over evil.
With one or more cylinders out of operation, the engine speed must be reduced because()
On offshore drilling units,each EPIRB or SART must be tested once every().
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
Before welding is permitted on a fuel tank, it must be certified or declared ()
Where tanks are arranged for either oil or ballast, () must be fitted in the pipeline.
Injectors for use with heavy fuel oil must be cooled by either water or light oil to ()
广告位招租WX:84302438

免费的网站请分享给朋友吧