首页
题目
TAGS
首页
/
题库
/
[单选题](单选、2.5分) I must tel的答案
搜答案
(单选、2.5分) I must tell you a letter from you.
单选题
2021-09-02 12:21
A、I was pleased to receive
B、I was pleased to receiving
C、I pleased to receive
D、I was pleased receiving
查看答案
正确答案
A
试题解析
标签:
棉花糖
河北工程技术学院大学英语1
感兴趣题目
(单选、25分) Do you want to change this lamp for__________or do you want your money back
(单选、25分)— I must apologize to you for the delay — ____________________________
You're always moaning about something or other. I wish you ______.
When welding or burning aboard a vessel, you must be certain that the space ().
If you must enter a room or compartment to combat the fire, keep an escape path ().
—Do the dishes,Mike,or I will tell mum!
—Do you learn Russian or French?—I learn _____.
—Do you learn Russian or French?—I learn ______.
“I love you, and because I love you, I would sooner _____ me for telling you the truth than adore me for telling you lies.” Pietro Aretino quotes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
I must tell you
a letter from you.
相关题目
____ you like it or not, I don’t care.( )
I must get to school ____ or other this morning.
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
-Do you like milk or coffee? -I prefer milk ___ coffee..
Either you or I _____ meet him in the park.
(单选、2.5分) I have been waiting for you _______.
(单选、2.5分) I must tell you a letter from you.
(单选、2.5分) 工程量清单采用什么单价计价?( )
(单选、2.5分) 造价工程师执业资格实行什么制度?( )
(单选、2.5分) 一个生产车间的基础工程为( )。
(单选、2.5分) 组织建设工程顺序施工时,其特点包括( )。
(单选、2.5分) 工程项目最有效的科学组织方法是( )。
(单选、2.5分) 工程网络计划的计划工期( )。
(单选、2.5分) 技术资料准备的内容不包括( )。
(单选、2.5分) 工程项目竣工验收应由( )组织。
(单选、2.5分) 2:1是缩小比例。
(单选、2.5分) 钢筋工程施工中要看懂( )。
(单选、2.5分) 地上水塔工程宜选用( )
Who can tell you whether an emergency is a “disaster” or not?
广告位招租WX:84302438
题库考试答案搜索网
免费的网站请分享给朋友吧