首页/ 题库 / [单选题]If the place named f的答案

If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.

单选题
2022-01-04 16:41
A、in the loading place
B、in the port or dock
C、in the loading spot
D、in the discharging spot
查看答案

正确答案
B

试题解析

标签: 海商法 经济学
感兴趣题目
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Do you think your hometown is a good place for the elderly? Why or why not?
相关题目
-I was wondering whether perhaps you could remember the name of the place.
-I'm afraid that _______ me for the moment.
-I was wondering whether perhaps you could remember the name of the place.
-I\'m afraid that _______ me for the moment.
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
-I was wondering whether perhaps you could remember the name of the place. -I.m afraid that _______ me for the moment.
-I was wondering whether perhaps you could remember the name of the place -Im afraid that _______ me for the moment
Where the contract is to insure the subject-matter at and from,or from one place to another or others,the policy is called a().
The drive motor will have a brake arranged to fail-safe, ieit will () the load if power fails or machine is stopped.
The drive motor will have a brake arranged to fail-safe, i√eit will () the load if power fails or machine is stopped.
()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.
If the carrier is responsible for the damage or loss of the cargo,()will have to pay to the insurance company.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The ship will be responsible for the cargo loaded or unloaded().
A ship is responsible for the cargo loaded or unloaded().
The ship will be responsible for the cargo loaded or unloaded().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
Keeping the draft at or below the load line mark will insure that the vessel has adequate().
If the Charterer loads or discharges the vessel in a shorter time than is allowed to him by the lay days,he may be entitled to().
广告位招租WX:84302438

免费的网站请分享给朋友吧