首页/ 题库 / [单选题]When anchored,increa的答案

When anchored,increasing the scope of the anchor chain normally serves to().

单选题
2022-01-05 10:55
A、prevent fouling of the anchor
B、decrease swing of the vessel
C、prevent dragging of the anchor
D、reduce strain on the windla
查看答案

正确答案
C

试题解析

感兴趣题目
The holding power of an anchor increases when the().
What happens to the efficiency of an anchor when it is moved from sand to mud?()
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire most likely to be mentioned?().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire mostlikely to be mentioned?().
If keep the fuel injection of main engine unchanged when ship is fouled, that will causeⅠ.The speed of main engine to be reduced Ⅱ.Ship speed to be reduced Ⅲ.The resistance torque of propeller to be increased Ⅳ.Trim at stern to increase()
When the load is increased on a turbocharged diesel engine, the amount of increased air supplied by the turbocharger will()
It has been decided that a collision due to any cause other than the negligence of the Shipowner or his servants is within the scope of().
When your vessel is on or near the path of an approaching tropical storm the().
The tension on an anchor cable increases so that the angle of the catenary to the seabed at the anchor reaches 10°. How will this affect the anchor in sandy soil?()
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
When anchored,increasing the scope of the anchor chain normally serves to().
Especially in adverse weather,risk of collision with an offshore supply vessel increases when the vessel is moored to what side of the unit?().
相关题目
When the anchor is brought to and holding,the horizontal component of anchor cable tensions should equal the().
In determining the scope of anchor line to pay out when anchoring a small boat,one must consider the().
The holding power of an anchor at a given scope of cable increases when the().
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
When dropping anchor,you are stationed at the windlass brake.The most important piece(s)of gear is(are)().
Increasing the area of the anchor flukes will().
()should you do first when heaving up the anchor.
When the dew point of the outside air is lower than or equal to the dew point of the air in the cargo hold,you should().
When weighing anchor in a rough sea,how would you avoid risk of damaging the bow plating ().
Increasing the speed of a centrifugal pump will result in an increase in its capacity in its capacityAnother means of increasing the capacity pump is to increase the()
When anchoring a vessel under normal conditions,which scope of chain is recommended? ()
If the result of loading a vessel is an increase in the height of the center of gravity,there will always be an increase in the().
Especially in adverse weather,risk of collision with an offshore supply vessel increase when the vessel is moored to what side of the unit?().
When the voltage remains constant and the resistance is increased in a series circuit, the flow of current ()
When a ship is entering to shallow water, ship resistance will be increased and the speed of main engine reduced.Due to the function of the governor, the main engine will()
When anchored,increasing the scope of the anchor chain normally serves to().
The Project Management Triangle is a model of the constraints of project management. These constraints have been listed scope (or quality), ( ), and cost
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
When the renewal verification is completed more than three months before the expiry date of the existing Document of Compliance or Safety Management Certificate, the new Document of Compliance or the new Safety Management Certificate should be valid from the date of () for a period not exceeding five years.
The holding power of an anchor is the().
广告位招租WX:84302438

免费的网站请分享给朋友吧