首页/ 题库 / [单选题]Two mooring lines ma的答案

Two mooring lines may be placed on the same bollard and either one cast off first if().

单选题
2022-01-10 05:05
A、the eye of the second line is dipped
B、the mooring lines are doubled
C、the bollard has two horns
D、one of the lines is a breast line
查看答案

正确答案
A

试题解析

相关题目
In the future, more ______ should be placed on the education of the young.
28, Which may be the most possible place for people to work in tomorrow?
In the future, more()should be placed on the education of the young.
Which vessel may show three lights in a vertical line,the top and bottom being red and the middle being white? ()
Inquiries()the condition of the patients may be made personally or by telephone.
The broadcast will normally be made on the two listed frequencies simultaneously except during transmitter maintenance periods when the broadcast will be made on the two frequencies().
The port State control officer or the surveyor authorized by the port State Administration must be aware that()may be carried on product carriers.
()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited by the terms of().
The sale usually takes place outside the house, with the audience()on benches, chairs or boxes.
Which statement is TRUE about placing the eyes of two mooring lines on the same bollard?()
If two mooring lines are to be placed on the same bollard,which method is BEST?().
During storm conditions on a ship,the mooring tensions should be adjusted so that().
During storm conditions on a vessel,the mooring tensions should be adjusted so that().
Which two of these are advantages of placing the VPN device in the DMZ on the firewall?()
A (n) () is a chemical or electro-chemical attack on the metal surface which may be further increased if the sea-water is polluted.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
Mooring()are placed on both banks of the Suez Canal about 200m apart.
The knot used to join two lines or two large hawsers for towing is called a().
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
广告位招租WX:84302438

免费的网站请分享给朋友吧