首页/ 题库 / [单选题]Before welding can b的答案

Before welding can be done in a tank that has carried petroleum products,a certificate must be obtained from().

单选题
2022-02-24 14:37
A、the Customs
B、the Register Bureau of Shipping
C、the Shipyard Fire Department
D、a certified gas chemist
查看答案

正确答案
D

试题解析

相关题目
The machine can’t be made perfect overnight; in fact, it should be improved ( ) .
The machine can’t be made perfect overnight; in fact, it should be improved ( ) .
The( )technique involves using project characteristics in a mathematical model to predict total project costs. Models can be simple or complex.
The(72)technique involves using project characteristics in a mathematical model to predict total project costs. Models can be simple or complex.
It won’t be long before she ______ living a new life in a foreign country.
______ must be done _____ the house before we can live in it.( )
Readers can‘t find pronunciation or meaning in ______. ( )
12It won’t be long before she ______ living a new life in a foreign country(5分)
根据所运货物的危险程度,《IBC规则》将散装化学品船分成()种类型,其中()型适合于装载危险性最大的散装化学品。
根据所运货物的危险程度,《IBC规则》将散装化学品船分成()种类型,其中()适合于装载危险性最小的散装化学品。
《防止散装运输有毒液体物质污染规则》中将有毒液体物质按可能对海洋资源或人类健康造成的损害程度分为()类。
《IBC规则》中的散装液体化学品主要指在37.8℃时绝对蒸气压力不超过()kg/cm2的液体散装货物。
The word “critical” in the sentence “This is a critical period as any loss of propulsion, or steering, can lead to collision, grounding, or other damage to the ship” can be best replaced by ().
Which condition must be satisfied before an EIGRP neighbor can be considered a feasiblesuccessor?()
When welding or burning aboard a vessel, you must be certain that the space ().
In engines with system, the lubricating oil can be added to the engine through the filling hole in the crankcase cover, by using a hand oil can, or through the separator pipe()
Prior to burning or welding on a fuel tank on a ship,regulations require that an inspection be made. An entry in the unofficial logbook is required if this inspection is made by().
My camera can be()to take pictures in cloudy or sunny conditions.
Assuming you build networks to exact specifications, what is the recommended maximum length a 10BaseT cable can be before it has to be segmented or repeated?()
Assuming you build networks to exact specifications, what is the recommended maximum length a 10BaseT cable can be before it has to be segmented or repeated?
广告位招租WX:84302438

免费的网站请分享给朋友吧