首页/ 题库 / [单选题]After the ship is ou的答案

After the ship is out of the harbour and in “Full Speed”, well change ().

单选题
2022-06-01 23:06
A、to fuel oil instead of diesel oil
B、for fuel oil instead of diesel oil
C、to diesel oil into fuel oil
D、for diesel oil into fuel oil
查看答案

正确答案
A

试题解析

感兴趣题目
The Master or person in charge of a ship is required to log().
It is the responsibility of the Master or person in charge of a ship to ensure that().
After conducting an abandonment drill,the Master or person in charge of a ship shall log().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
Whenever visible traces of oil are observed on or below the surface of the water in the immediate vicinity of ship or its wake,Governments of Parties to the Convention should,to the extent they are reasonably able to do so,promptly()the facts bearing on the issue of whether there has been a violation of the provisions of this Regulation or Regulation 10 of this Annex of MARPOL 73/78.
After the ship is out of the harbour and in “Full Speed”, well change ().
The master may bind the Shipowner or Charterer()doing such things as are necessary on the part of the one or of the other to carry out the contract.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
The () is used for hauling in or letting out the wires or ropes.
The part of a windlass which physically engages the chain during hauling or paying out is the().
The cooling of the piston is carried out by circulating () across the underside of the crown and inside the ring belt or through specially shaped passages.
相关题目
第一组:When a nominated surveyor or recognized organization determines that the condition of the ship or its equipment does not correspond substantially with the particulars of the Certificate (IOPP) or is such that the ship is not fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment, such surveyor or organization shall immediately ensure that corrective action is taken and shall in due course notify the Administration. If such corrective action is not taken, the Certificate shall be withdrawn and the Administration shall be notified immediately; and if the ship is in a port of another Party, the appropriate authorities of the port State shall also be notified immediately. When an officer of the Administration, a nominated surveyor or a recognized organization has notified the appropriate authorities of the port State, the Government of the port State concerned shall give such officer, surveyor or organization any necessary assistance to carry out their obligations under this regulation. When applicable, the Government of the port State concerned shall take such steps as will ensure that the ship shall not sail until it can proceed to sea or leave the port for the purpose of proceeding to the nearest appropriate repair yard available without presenting an unreasonable threat of harm to the marine environment.Whenever an accident occurs to a ship or a defect is discovered which substantially affects the integrity of the ship or the efficiency or completeness of its equipment covered by this Annex the master or owner of the ship shall report at the earliest opportunity to the Administration, the recognized organization or the nominated surveyor responsible for issuing the relevant Certificate, who shall cause investigations to be initiated to determine whether a survey as required by paragraph 1 of this regulation is necessary. If the ship is in a port of another Party, the master or owner shall also report immediately to the appropriate authorities of the port State and the nominated surveyor or recognized organization shall ascertain that such report has been made.When a ship is found not fit to proceed to sea by a nominated surveyor, then corrective action should be taken and be informed immediately. (1)the master (2)the authorities of port State (3)the Administration
__________ is the act performed by or resulting from saying something; it is the consequence of, or the change brought about by the utterance.
After the victory of the English Revolution, the movement of the Diggers broke out. The leader of this revolt is Wat Tyler.()
The word “critical” in the sentence “This is a critical period as any loss of propulsion, or steering, can lead to collision, grounding, or other damage to the ship” can be best replaced by ().
The procedure of strengthening damaged structures on a ship by using wood or steel is called().
Apart from special contract or statute every Shipowner is()a liability akin to that of a common carrier,irrespective of whether the goods were shipped by a Charterer or on a general ship.
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
A ship is responsible for the cargo loaded or unloaded().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or().
The president (or head) of the House of Lords in Britain is ()
If there is a strike or lock-out affecting the cargo on or after vessel’s arrival at port of discharge and the same has not been settled within 48 hours,Receivers shall have the option of keeping vessel waiting until such strike or lock-out is at an end against paying half demurrage after expiration of the time prescribed for discharging or ordering the vessel to a substituting port.The “same” refers to().
A ship can request completion of a () when the ship is at a higher security level than the port facility or another ship it is interfacing with.
What must the Master or person in charge of a ship enter in the logbook after conducting a boat drill? ()
The Master or person in charge of a ship shall ensure the crane record book shows the().
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
It is the responsibility of the Master or person in charge of a ship to ensure that().
广告位招租WX:84302438

免费的网站请分享给朋友吧