首页/ 题库 / [单选题]When a ship is in tr的答案

When a ship is in tropical zone and in seawater of density 1025,she must not load to more than the upper edge of the line marked().

单选题
2022-06-29 14:59
A、S
B、T
C、W
D、F
查看答案

正确答案
B

试题解析

相关题目
The shipment time is June or July at our __ and the goods will be shipped in one __
A tug is “in irons” when held in a fixed position by()
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
Camber,in a ship,is usually measured in().
The person on a ship who is responsible for maintaining the engineering spaces in a clean and sanitary condition is the().
When a vessel is stationary and in a hogging condition,the main deck is under().
When are fore and aft draft readings required to be entered in the unofficial logbook of a ship? ()
When the density of water is 1000,i.e.in fresh water and in summer zone a ship may load to the upper edge of the line marked().
The shipment time is June or July atour()and the good swill be shipped in one().
The man in charge of a ship is().He is responsible for the ship ,her cargo and the safety of the crew.
The Master or person in charge on a ship shall insure that line throwing equipment is not operated().
When receiving a distress alert, the SAR authorities ashore and the ships in the vicinity of the ship in distress will()soonest.
When receiving a distress alert, the SAR authorities ashore and the ships in the vicinity of the ship in distress will()in a coordinated search and rescue operation with the minimum delay.
When receiving a distress alert, the SAR authorities ashore and the ships in the vicinity of the ship in distress will()in a coordinated search and rescue operation with the minimum delay.
In a data warehouse environment, data is only valuable when it is organized and displayed as(75)
At the instant when a string of casing being run from a ship is landed in the well head,().
The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.
A ship can request completion of a () when the ship is at a higher security level than the port facility or another ship it is interfacing with.
When receiving a distress alert, the SAR authorities ashore and the ships in the vicinity of the ship in distress will()soonest.
It is the responsibility of the Master or person in charge of a ship to ensure that().
广告位招租WX:84302438

免费的网站请分享给朋友吧