首页/ 题库 / [单选题]It is desirable that的答案

It is desirable that water used for drinking( ) pure. 选项

单选题
2021-09-02 12:00
A、 were
B、 should be
C、 is
D、 ought to be
查看答案

正确答案
B

试题解析

标签: 综合英语
相关题目
It is desirable that the airplane ___________ as light as possible.
It's said that the weather will ( ) hot for another three or four days.
It\'s said that the weather will ( ) hot for another three or four days.
Fresh water is used for the cooling of cylinder jackets and () of the marine diesel engine.
It is important that the water () very often as this can lead to increased deposits.
The use of one name for that of another associated with it is rhetorically called _____.
It is obvious that there are two vitamins. _____ is soluble in fat; ___ is soluble in water.
It is desirable that water used for drinking( ) pure. 选项
When a dog is barking, you assume it is barking for something or at someone that exists hear and now It couldn’t be sorrowful for some lost love or lost bone This indicates the design feature of __________
In towing it is desirable for the tug and the vessel to ride wave crests simultaneously because().
It is NOT advisable to use nylon for alongside towing because it().
It is not advisable to use nylon for alongside towing because it().
It is not advisable to use nylon for alongside towing because it().
The MOST important feature of the material used for making the binnacle of a standard magnetic compass is that it is().
If a seaplane is not used as a means of transpiration on water but is capable of being used so,it shall().
The most common type of containment device for spilled oil on the water is the use of ().
is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.
( )is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.
● (73) is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist betweenthem.(73)
It is()that he has to ask for help.