技术交底的内容有( )等。

多选题
2021-09-03 17:17
A、图纸交底
B、材料交底
C、施工组织交底
D、设计变更交底
查看答案

正确答案
A@#@C@#@D

试题解析

感兴趣题目
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The () is used for hauling in or letting out the wires or ropes.
Vessels must be()valid certificate of nationality or certificated of registry or license.
When loading or discharging dry mud or cement,crew members should use goggles and().
Effects which are dutiable or subject to prohibitions or restrictions should be declared in ().
The()may examine or re-examine the goods or take samples from them straightaway in the absence of the consignee or the consignor whenever it considers this necessary.
()are liable to be stoten, pilfered or may damaged due to improper handing or stowage.
Banks have no liability for any delay or loss caused by postal or telex failure.
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
背景材料: 某路桥公司在某地承建了一座特大型斜拉桥工程,工程开工前,项目部拟定了有关技术交底的要求如下:(1)技术交底按如下方式进行:1)技术交底应按不同层次、不同要求和不同方式进行,应使所有参与施工的人员掌握所从事工作的内容、操作方法和技术要求。2)项目经理部的技术交底工作由项目经理组织和主持实施。3)总工负责向班组交底。4)对于分包工程,项目经理部应向分包单位详细地就承包合同中有关技术管理、质量要求、工程监理和竣工验收办法以及合同中规定双方应承担的经济合同法律责任等内容进行全面交底。(2)技术交底应包含以下内容:1)承包合同中有关施工技术管理和监理办法,合同条款中规定的法律、经济责任和工期:2)分部、分项工程的施工特点、质量要求;3)工程合同技术规范、使用的工法或工艺操作规程;4)材料的特性、技术要求及节约措施;5)季节性施工措施;6)试验工程项目的技术标准和采用的规程;7)适应工程内容的科研项目、四新项目和先进技术、推广应用的技术要求。 (1)作为一名建造师,你认为技术交底的方式中有何不妥之处?请指出,并改正。 (2)技术交底的内容是否完善?如不完善,请补充。
施工现场消防安全管理包括:()、防火技术方案、()、消防安全教育与培训、消防安全技术交底、()和消防档案管理等内容。( )
逻辑运算符(AND、NOT、OR)的运算顺序是AND→OR→NOT。
相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

技术交底是施工组织设计和施工方案的具体化,施工作业技术交底的内容必须具有()。
路基施工技术交底应分级进行,即分管理层、技术层和作业层进行技术交底,做到有针对性地交底。下述技术交底做法不合理的是()
技术交底就是施工企业的技术负责人向项目经理部进行施工组织设计的交底()
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
任何一项分部分项工程在施工前,工程技术人员都应根据施工组织设计的要求,编写有针对性的安全技术交底书,由( )对班组工人进行交底。
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
广告位招租WX:84302438

免费的网站请分享给朋友吧