首页/ 题库 / [单选题]刚体系统内理想气体绝热膨胀后,参数变化结的答案

刚体系统内理想气体绝热膨胀后,参数变化结果()

单选题
2021-12-31 23:25
A、温度不变,熵不变;
B、温度上升,熵不变;
C、温度不变,熵增加;
D、温度上升,熵增加
查看答案

正确答案
C

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

A cabinet or space containing the controls or valves for the fixed firefighting system must be().
A cabinet or space containing the controls or valves for the fixed firefighting system must be().
一级注册建筑师由全国注册建筑师管理委员会负责注册和管理,并报()备案。
我国注册建筑师级别设置分为一级注册建筑师和二级注册建筑师。其中二级注册建筑师注册标准不低于目前发达国家现行注册标准。()
CASE OF DEATH OR SERIOUS INJURY TO A PERSON IN AN ACCIDENT OR SHIPPING DISASTER is().
根据《注册建筑师条例》,注册建筑师的权利为()。I•从事国家规定的一定跨度、跨径、高度以上的房屋建筑设计;Ⅱ.任何单位和个人修改注册建筑师的图纸应征得该注册建筑师的同意;Ⅲ.非注册建筑师可以注册建筑师的名义从事建筑设计业务;IV.二级注册建筑师可以一级注册建筑师的名义执行业务;V•注册建筑师可以自己的名义承接设计任务
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
广告位招租WX:84302438

免费的网站请分享给朋友吧