首页/ 题库 / [单选题]In the process of th的答案

In the process of the shafting management, special attention should be paid to()

单选题
2022-01-01 12:08
A、on the sailing, the water in the aft peak tank should be excluded as much as possible
B、the stuffing style ahead sealing shouldn’t have any water leaking out
C、Simplex astern sealing shouldn’t have any oil leaking out
D、Simplex ahead sealing can have some oil leaking out
查看答案

正确答案
C

试题解析

感兴趣题目

The()Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements.

Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the( )
Project Integration Management includes the processes and activities to identify, define, combine, unify, and coordinate the various processes and project management activities within the Project Management Process Groups.()process does not belong to Project Integration Management.
The“person in the phrase ”to designate a person or persons ashore having direct access to the highest level of management” refers to ().
Which of the following characteristic of lube oil helps to reduce the amount of deposits in the piston ring belt during the combustion process in a diesel engine?()
The schedule management plan is a component of the project management plan. The Schedule management plan maybe formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
The schedule management plan is a component of the project management plan The schedule management plan may be formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.

Requirements management is the process of ()

In sewage treatment, the term maceration refers to the process of ()
()is not a process of weathering of the oil spilled in the sea water.
()is not a process of weathering of the oil spilled in the sea water.
()is not a process of weathering of the oil spilled in the sea water.
相关题目

The ()Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements.

()is the general meaning of the contract, bill, note and proof in the process of logistics.
If the goods is damaged or lost in the process of logistics, the shipper can()to the carrier.

In the process of communication requirement analysis, the project manager should consider the number of potential communication channels or paths as an indicator of the complexity of a project's communication. According to Metcalfe's Law, a project with 10 stakeholders has()potential communication channels.

In the process of the shafting management, special attention should be paid to()
In the management of the shafting, because() carry heavy load and caused high temperature easily, it should be paid attention.
●Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the (73).
Senior members of the staff competed eagerly()the position of sales manager in the company.
The defences and limits of liability()in this bill of lading shall apply in any action against the carrier for loss of or damage to the goods whether the action be founded in contract or in tort.
In the bitter cold, the explorers managed to()despite the shortage of food.
Misalignment of the drive shaft and propeller shaft flanges can be detected by using a dial indicator or ().
Misalignment of the drive shaft and propeller shaft flanges can be detected by using a dial indicator or ()
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.
()is the general meaning of the contract, bill, note and proof in the process of logistics.
()is the general meaning of the contract bill note and proof in the process of logistics.
When the renewal verification is completed more than three months before the expiry date of the existing Document of Compliance or Safety Management Certificate, the new Document of Compliance or the new Safety Management Certificate should be valid from the date of () for a period not exceeding five years.
The( )Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project’s requirements.

The ()Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the project's requirements.

广告位招租WX:84302438

免费的网站请分享给朋友吧