首页/ 题库 / [单选题]In the management of的答案

In the management of the shafting, because() carry heavy load and caused high temperature easily, it should be paid attention.

单选题
2022-01-01 12:09
A、the bearing near to the diesel engine
B、the intermediate bearing near to the thrust bearing
C、the intermediate bearing near to the sterntube
D、the bearing located at the middle of the diesel engine and the sterntube
查看答案

正确答案
C

试题解析

感兴趣题目
The project team members should also be aware of one of the fundamental tenets of modern quality management: quality is planned, designed and built in, not()
The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.
()anything provided for in Clause 7 and 8 of this bill of lading and subject to Clause 17,if it can be proved where the loss or damage occurred the carrier and the merchant shall,as to the liability of the carrier,be entitled to require such liability to be determined by the provisions contained in any relevant international convention or national law.
The“person in the phrase ”to designate a person or persons ashore having direct access to the highest level of management” refers to ().
Although the Shipowner may be responsible for the loss or damage to the goods,his liability may be limited()the terms of the contract or the statute.
In which form of projects origination would the project manager be likely to exercise the most control over Project resources.()
In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.
In the case of an injury causing a person to be incapacitated,the Master or person in charge of a mobile offshore drilling unit must submit a report to the().
The schedule management plan is a component of the project management plan. The Schedule management plan maybe formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
The schedule management plan is a component of the project management plan The schedule management plan may be formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
Although the main business of the shipowners may be that of brewers,in their capacity as shipowners they must()by the standard of conduct of the ordinary reasonable Shipowner in the management and control of vessels.
The records of ship security training, drills and exercises shall be kept in the working language or languages of the shipIf the language or languages used are not(), a translation into one of these languages shall be included.
相关题目
Fill in the blanks with the appropriate form of the verb or verb phrase given: If the weather __________ (be) more favorable, the crops would be growing still
In the ________ of the project not being a success, the manager stands to lose up to $30  million
In the process of the shafting management, special attention should be paid to()
In the management of the shafting, because() carry heavy load and caused high temperature easily, it should be paid attention.
The center line condition of the transmission shaft can be checked by()
Senior members of the staff competed eagerly()the position of sales manager in the company.
The defences and limits of liability()in this bill of lading shall apply in any action against the carrier for loss of or damage to the goods whether the action be founded in contract or in tort.
Misalignment of the drive shaft and propeller shaft flanges can be detected by using a dial indicator or ().
Misalignment of the drive shaft and propeller shaft flanges can be detected by using a dial indicator or ()
The () of the main shaft should be measured with a ().
If the state of the goods at the time they were handed over to the consignee has been the subjectof a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
Allowances may be made for the expansion and contraction in piping by the use of expansion joints or ().
Using the LIST command in Recovery Manager (RMAN), which two pieces of information in the RMANrepository can be listed?() (Choose two.)
Even if the Shipowner is liable for the loss of or damage to the goods whilst in his custody,his()may have been limited by a clause in the contract or by statute,so that the owner of the cargo will be unable to recover the full amount of his loss.
Which of the valves listed should be used either in the fully opened or the fully closed position?()
In information theory, "information" is regarded as knowledge which reduces or removes(71) about the occurrence of a specific event from a given set of possible events. The concept "event" is to be understood as used in the theory of probability. For instance, an event may be the occurrence of a(72) character or word in a given message or in a given position of a message.In communication theory, channel is defined as that part of a communication system that connects the message source with the message sink. An encoder may be inserted between the message source and the input to the channel, and a(73) between the output of the channel and the message sink. Generally, these two units are not considered as being parts of the channel. In certain cases, however, they may be considered as pans of the message source and message sink,(74) In information theory(75) to Shannon, the channel can be characterized by the set of conditional probabilities of occurrence of all the messages received at the message sink when a given message emanates from the message source.
The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.
When the renewal verification is completed more than three months before the expiry date of the existing Document of Compliance or Safety Management Certificate, the new Document of Compliance or the new Safety Management Certificate should be valid from the date of () for a period not exceeding five years.
广告位招租WX:84302438