首页/ 题库 / [单选题]Planning to stow()in的答案

Planning to stow()in the end lower holds will result in much broken stowage.

单选题
2022-01-01 12:40
A、large crates or cases
B、small curved items
C、drums
D、filler cargo
查看答案

正确答案
A

试题解析

相关题目
“To be, or not to be - that is the question;/Whether’ tis nobler in the mind to suffer / The slings and arrows of outrageous fortune,/Or to take arms against a sea of troubles ,/And by opposing end then?” These lines are taken from ______.
Who is giving the introduction to emergency planning in the community?
The manager or his assistant ______ planning to go
In the event of damage to the DEEP WATER SHIP which results in flooding to one of the lower-hull tanks,pump from().
To determine the weight capacity of a deck in a cargo hold,you would refer to the().
What does the term end-for-end refer to in regard to a wire towing hawser().
Making water rapidly in all holds,all passengers and crew were ordered on deck()and all boats were lowered to rail.
Planning to stow()in the end lower holds will result in much broken stowage.
Why did they lower their heads in shame according to the passage?
From the middle part to the end of the 18th century, in English literature () flourished. They were mostly stories of mystery and horror which take place in some haunted or dilapidated middle age castles.
To ensure quality, what is the maximum end-to-end transit time in milliseconds on a voice network?()
When the dew point of the outside air is lower than or equal to the dew point of the air in the cargo hold,you should().
The watches and the the camera materials were not stowed in the poop cabin. They were stowed in the chief officer’s cabin().
If a void occurs in the cargo hold,it is better to()to control the broken stowage.
()water is the water in the hold to keep the ship’s stability.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The space in No.1 lower hold is nearly full up but there is still some()side.
You have a quantity of bagged cargo to stow in a block in 3 UTD. Which stow will provode the maximum block stability ?().
In a general cargo crane, () is fitted to raise or lower the jib.
广告位招租WX:84302438

免费的网站请分享给朋友吧