首页/ 题库 / [单选题]Inflammable cargo()i的答案

Inflammable cargo()in the holds adjacent to the engine room.

单选题
2022-06-21 13:41
A、shall never be stowed
B、may be stowed
C、can be stowed
D、should be stowed
查看答案

正确答案
A

试题解析

感兴趣题目
A cargo hold has been determined to have a relative humidity of 80% and a dry bulb temperature of 80 ℃ and a dry bulb temperature of 85℃.When the hold is sealed and the dry bulb temperature decreases, the relative humidity in the space will ()
The partial loss of or damage to the cargo is not recoverable from the insurer resulting from natural calamities under()in PICC Ocean Marine Cargo Clauses.
In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.
This is deck cargo. ()stow it in the holds.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
Inflammable cargo()in the holds adjacent to the engine room.
The internal volume of a cargo hold measured from the inside faces of the cargo battens,the lower side of the deck beams,and the top of the tank top ceiling is known as the().
Cargo in hold No.2 is on() .
Which hold shall we put all the cargo in?()
All the holds and other parts of the ship in which cargo is to be stowed should be()for the carriage.
Battens are fitted in cargo holds across the frames of the vessel from the turn of the bilge upward. The purpose of these cargo battens is().
Battens are fitted in cargo holds across the frames of the vessel from the turn of the bilge upward. The purpose of these cargo battens is().
相关题目
How can Malinda hold the respondentsinterest in filling in the questionnaire
To determine the weight capacity of a deck in a cargo hold,you would refer to the().
When possible,what should be the FIRST step in combating a fire on deck resulting from a cargo overflow or a leaking cargo line?()
The Vessel’s cargo holds are properly fitted with()in way of hatches.
You’d better()the optional cargo block stowage in the tweendecks, then it can be easily discharged either at Shanghai or Dalian.
Loading cargo operation in hold No.3 stopped owing to().
When the dew point of the outside air is lower than or equal to the dew point of the air in the cargo hold,you should().
()may be laid ready for the cargo or may just be put in bundles ready for the stevedores to lay out as the cargo is loaded.
When arranging cargo for()in the holds,we should give first consideration to ship’s seaworthiness and her being in a good sea-going trim after loading.
When cargo is shifted from the main deck into the lower hold of a vessel,().
If a void occurs in the cargo hold,it is better to()to control the broken stowage.
Sweat damage will occur in a cargo hold containing machinery parts when().
When cargo is shifted from the main deck into the lower hold of a vessel,().
All the cargo holds must be()cleaned out()meet the requirement of the cargo surveyor.
There is another thing I want to let you know.The lighting in the hold is very poor,even ()dark to work the cargo.
Be careful()mix the inflammable cargo with that kind.
It would be possible that part of the cargo got()as great change in the weather during the voyage caused heavy()in the hold.
The Charterers shall have the privilege to ship dangerous cargo in accordance with()Code or any competent authorities’ regulations,as applicable.
In a general cargo crane, () is fitted to raise or lower the jib.
It’s()to stow optional cargo in the lower hold.You’d better give it block stowage in the tweendecks,then it can be easily discharged either at Shanghai,or Dalian or Tianjin.
广告位招租WX:84302438

免费的网站请分享给朋友吧