首页/ 题库 / [单选题]Battens are fitted i的答案

Battens are fitted in cargo holds across the frames of the vessel from the turn of the bilge upward. The purpose of these cargo battens is().

单选题
2022-06-30 06:15
A、for securing a snatch block when snaking cargo into the wings of the hold
B、to prevent cargo from coming in contact with the vessel's frames or shell plating
C、tp prevent fittings to which cargo lashing may be secured
D、to support the dunnage floors which are laid down between tiere of cargo
查看答案

正确答案
B

试题解析

相关题目
To determine the weight capacity of a deck in a cargo hold,you would refer to the().
When possible,what should be the FIRST step in combating a fire on deck resulting from a cargo overflow or a leaking cargo line?()
()cargoes in IMSBC code are those that are likely to liquefy.
The Vessel’s cargo holds are properly fitted with()in way of hatches.
Certain dangerous goods are required “to be stowed in a mechanically ventilated space”. When such goods are carried in a closed Ro/Ro cargo space or a special category space,this space should().
Loading cargo operation in hold No.3 stopped owing to().
When the dew point of the outside air is lower than or equal to the dew point of the air in the cargo hold,you should().
Hand holds or straps on the underside of an inflatable liferaft are provided().
Hand hold or straps on the underside of an inflatable are provided().
Conventional anchors are least likely to hold in a bottom consisting of().
If a void occurs in the cargo hold,it is better to()to control the broken stowage.
Sweat damage will occur in a cargo hold containing machinery parts when().
All the cargo holds must be()cleaned out()meet the requirement of the cargo surveyor.
Stretchers are fitted in lifeboats to provide a().
It would be possible that part of the cargo got()as great change in the weather during the voyage caused heavy()in the hold.
Where tanks are arranged for either oil or ballast, () must be fitted in the pipeline.
Where tanks are arranged for either oil or ballast () must be fitted in the pipe so that only the ballast main or the oil transfer main connected to the tank.
In a general cargo crane, () is fitted to raise or lower the jib.
Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel? ()
The() is fitted in pair one is the main valve, the other the auxiliary or standby.
广告位招租WX:84302438