首页/ 题库 / [单选题]不属于地基渗流破坏迹象的是()。的答案

不属于地基渗流破坏迹象的是()。

单选题
2022-01-02 01:13
A、冒水冒沙
B、流出游离石灰
C、地基表面粗糙、麻坑等
D、出清水
查看答案

正确答案
D

试题解析

相关题目
boost的意思是:help or encourage to increase or improve
eloquent的意思是:fluent or persuasive in speaking or writing

A campus emergency ______ occur at any time of the day or night, weekend, or holiday, with little or no warning.

《水利工程设计概(估)算编制规定》将水利工程按工程性质划分为:枢纽工程、引水工程及河道工程。引水工程及河道工程包括()。
河道工程主要包括在河道及河道管护范围内所修建的防洪工程、治河工程和其它()。
在应用ORS液的过程中,错误的是()
不属于地基渗流破坏迹象的是()。
检查地基有无渗流破坏时,应先观察有无渗水现象,再查找渗流破坏迹象。
Mainly east 3 or 4 partly cloudy to overcast occasional rain()slowly south moderate or good.
()any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local quarantine officer must be notified immediately.
Should any case or suspected case of quarantinable disease,or any case of eruptive disease or any death be discovered,the local Quarantine Officer must be()immediately.
Masters are()solely responsible for all damages or accidents of whatever kind resulting from the navigating or handling of their vessels by day or by night.
系统中雷达状态包括Unknown、Operational(or ON)、Failed(or OFF)、Detached。
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Shutdown price(or point,or rule) 停业价格(或停业点、停业原则)
设t=2,b=3,c=4,d=5,则下面语句输出的是( )。 Print3>2*b Or a=c And bc Or c>d
翻译:With Average or With Particular Average(WA or WPA)()
()shall be liable for loss of and damage to the Vessel and/or goods arising or resulting from inaccuracies in stating the description,quantity,weight,measurement or contents.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
广告位招租WX:84302438

免费的网站请分享给朋友吧