首页/ 题库 / [单选题]The primary danger i的答案
相关题目
船舶主机失去动力,在良好海况中漂航,此时船舶保险人应协助被保险船舶所有人尽量签订哪种救助合同()。
In terms of pressure and temperature in the refrigerant in the compressor, what happens to the primary?()
What is required in addition to the heat,fuel,and oxygen of the fire triangle to have a fire?()
The defective places in the furnace () with fire bricks.
If the master has acted unreasonably,e.g. knowing of the danger in the port has still proceeded to enter it,and danger results,the Charterer will().
Your vessel is equipped with a fixed CO2 system and a fire main system. In the event of an electrical fire in the engine room what is the correct procedure for fighting the fire?()
Your vessel is equipped with a fixed C02 system and a fire main system. In the event of an electrical fire in the engine room what is the correct procedure for fighting the fire?().
The primary danger in helicopter fires is().
The primary concern in aiding a back injury patient is().
我国海商法规定,因船舶转让而转让船舶保险合同的,应当取得保险人同意。
我国海商法规定,因船舶转让而转让船舶保险合同的,应当取得保险人同意。未经保险人同意,船舶保险合同从船舶转让时起解除;船舶转让发生在航次之中的,船舶保险合同立即解除。
根据我国《海商法》规定,当被保险船舶在保险期内发生转让,对于船舶转让被保险人未征得保险人同意而使保险合同终止时,则().
Fire protection and manning regulations for towing vessels state that the Master or person in charge must ensure that all crew members who have not participated in the drills or received the safety orientation().
The defective place in the furnace should be () with fire bricks.
The basic training in fire prevention and fire fighting should include the theoretical elements which should cover ().
In my opinion,the manner is()that the duty engineer reported the small fire in engine room.
In the event of a fire, the doors to a stair tower must be closed to prevent the spread of fire by ().
Each hose in the fuel transfer system for helicopter refueling must meet the standards of the().
Persons engaged in the transport of dangerous goods shall()training in the contents of dangerous goods requirements commensurate with their responsibilities.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
广告位招租WX:84302438

免费的网站请分享给朋友吧