首页/ 题库 / [单选题]To prevent the build的答案

To prevent the build up of high stresses engine must not be run continuously ().

单选题
2022-01-03 01:35
A、faster than dead slow speed
B、slower than dead slow speed
C、with the output of MCR
D、at critical speed
查看答案

正确答案
D

试题解析

感兴趣题目
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
The goal, which they are unlikely to live to see , is tocure, prevent or manage all diseasesin the next 80or so years.
The pollution prevention regulations do not apply to the transfer or discharge of ()
Whenever visible traces of oil are observed on or below the surface of the water in the immediate vicinity of ship or its wake,Governments of Parties to the Convention should,to the extent they are reasonably able to do so,promptly()the facts bearing on the issue of whether there has been a violation of the provisions of this Regulation or Regulation 10 of this Annex of MARPOL 73/78.
The master may bind the Shipowner or Charterer()doing such things as are necessary on the part of the one or of the other to carry out the contract.
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
A salvor may be()the whole or part of the payment due under Salvage Convention to the extent that the salvage operations have become necessary or more difficult because of fault or neglect on his part or if the salvor has been guilty of fraud or other dishonest conduct.
The objectives of the ISM Code are to ensure ①safety at sea②prevention of human injury or loss of life③avoidance of damage to the marine environment and to property
The objectives of()are to ensure safety at sea, prevention of human injury or loss of life, and avoidance of damage to the environment,in particular to the marine environment and to property.
Strainers, sometimes called (), are devices designed to prevent the passage of unwanted solids into or further along a system.
Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().
Any alteration of course and/or speed to avoid collision shall,if the circumstances of the case admit,()to another vessel observing visually or by radar.
相关题目
The teacher seldom let an opportunity to teach his students or to help them make up for the days of schooling they had missed ___
《中华人民共和国海船船员船上培训管理办法》中的船上培训是指申请三副、三管轮适任证书的船员通过理论考试后在船舶上进行的(),以及申请船长、轮机长、大副、大管轮适任证书的船员通过理论考试后在船舶上进行的()。
申请海船船员适任证书考试的船员的应具备的条件包括。()
根据我国《海船船员适任考试、评估和发证规则》的规定,在中国籍海船上任职的船长、甲板部高级船员和值班水手应当持有与其所服务的()和所担任的职务相符的有效适任证书。I、船舶航区;II、船舶种类;III、船舶等级;IV、主机类别。

根据《中华人民共和国海船船员适任考试发证规则》的规定,在中国籍海船上任职的船长、甲板部高级船员金额值班水手应当持有与其所服务的()和所担任的植物相符的有效适任证书。
①船舶航区;
②船舶种类;
③主机功率;
④船舶吨位。

The payment proportionate to the part of the voyage accomplished or to the part of the cargo delivered is referred as().
According to Figure 3, clasts and matrix particles having diameters greater than or equal to 0.5 mm made up approximately what percent of the total mass of the combined samples?
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
To prevent the build up of high stresses engine must not be run continuously ().
The Urgency Signal()indicates that the station calling has a very urgent message to transmit concerning the safety of a ship or aircraft,or of some person on board or within sight.
()means any person by whom or in whose name or on whose behalf a contract of carriage of goods by sea has been concluded with a carrier,or any person by whom or in whose name or on whose behalf the goods are actually delivered to the carrier in relation to the contract of carriage of goods by sea.
If he is a common carrier,he is absolutely responsible to the owner of the goods carried ()any loss or damage to them unless caused by an Act of God or the Queen’s enemies,or the inherent vice in the goods themselves,or the negligence of the owner of the goods,or a general average sacrifice.
The master should()necessary precautions to prevent accidents or damage.
Owners are to be responsible for loss of or damage to the goods or delay in delivery of the goods only in case the loss,damage or delay has been caused by the improper or negligent stowage of the goods.This means that().
Where a container,pallet or similar article of transport is used to consolidate goods,the number of packages or units enumerated in the bill of lading as packed in such article of transport()to be the number of packages or units in calculating the amount beyond which the carrier or the ship is not reliable.
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire most likely to be mentioned?().
Off hire is when a vessel breaks down,strands,or has any damage that prevents the working of cargo or delays the sailing of the vessel.Under which of the following charter parties is off hire mostlikely to be mentioned?().
In order to prevent stress from being set up in the metal, expansion joints are fitted which _____ the stress by allowing the pipe to expand or contract freely.
Which of the following do not belong to the same type according to the manner or place of articulation?  
广告位招租WX:84302438

免费的网站请分享给朋友吧