首页
题目
TAGS
首页
/
题库
/
[单选题]The combined fan dis的答案
搜答案
The combined fan discharge rate in an inert gas system is related to the().
单选题
2022-01-04 01:15
A、shoreside loading rate
B、maximum cargo pump discharge rate
C、boiler forced draft fan rate
D、size of the largest cargo tank
查看答案
正确答案
B
试题解析
标签:
液体散装危险品与IBC规则
感兴趣题目
The total quantity of oil discharge into the sea()for existing tankers 1/15000 of the total quantity of the particular cargo or which the residue formed a part().
The pollution prevention regulations do not apply to the transfer or discharge of ()
At any rate ()is liable for delay in obtaining the necessary Customs House papers for discharging,when the delay arises from the fact that special papers are required for the particular cargo carried.
When discharging oil from an oil tanker the instantaneous rate()60 liters per nautical mile.
()is the rate of discharging here?
Except as provided for otherwise,an oil tanker might discharge certain amount at certain rate of oil or oily mixtures into sea when().
An oil tanker,except as provided for otherwise,might discharge certain amount at certain rate of oil or oily mixtures into sea when().
() system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.
Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().
下列散装的()属于IMO谷物规则中定义的散装谷物。
When the garbage is mixed with some discharges having different disposal or discharge requirements, shall apply()
IBC规则仅适用于()建造的散化船。
相关题目
IBC规则适用于()建造的船舶。
同一名称的散装危险货物与包装危险货物的分类号()。
根据所运货物的危险程度,《IBC规则》将散装化学品船分成()种类型,其中()型适合于装载危险性最大的散装化学品。
根据所运货物的危险程度,《IBC规则》将散装化学品船分成()种类型,其中()适合于装载危险性最小的散装化学品。
《防止散装运输有毒液体物质污染规则》中将有毒液体物质按可能对海洋资源或人类健康造成的损害程度分为()类。
根据现行的MPRPOL公约,哪些是任选附则?()I、《防止油污规则》;II、《防止船物垃圾污染规则》;III、《防止船舶造成空气污染规则》;IV、《控制散装有毒液体物质污染规则》
下列散装的()不属于IMO谷物规则中定义的散装谷物。
《IBC规则》中的散装液体化学品主要指在37.8℃时绝对蒸气压力不超过()kg/cm
2
的液体散装货物。
包装危险货物与散装危险货物之间的隔离要求一般()包装危险货物之间的隔离要求。
Goods of an inflammable,explosive or dangerous nature to the shipment whereof the carrier,master or agent of the carrier,has not consented,with knowledge of their nature and character,may at any time before discharge,()at any place or destroyed or rendered innocuous by the carrier without compensation.
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
The discharge rate or capacity of a centrifugal pump will vary directly as the ().
If the redelivery of a vessel is delayed by causes (),hire is payable at the charter rate until redelivery even though the market rate may have gone up or down.
The combined fan discharge rate in an inert gas system is related to the().
After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or().
If there is a strike or lock-out affecting the cargo on or after vessel’s arrival at port of discharge and the same has not been settled within 48 hours,Receivers shall have the option of keeping vessel waiting until such strike or lock-out is at an end against paying half demurrage after expiration of the time prescribed for discharging or ordering the vessel to a substituting port.The “same” refers to().
How is the Master or operator of a vessel required to keep the crew informed of the regulations concerning the discharging of garbage overboard?().
Through a () pump, the liquid is transferred from the suction to the discharge by the mechanical variation of the volume of a chamber or chambers.
广告位招租WX:84302438
题库考试答案搜索网
免费的网站请分享给朋友吧