首页/ 题库 / [单选题]When planning the lo的答案

When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()

单选题
2022-01-01 12:41
A、Draft and trim
B、Limits of the bending moments
C、Rate of discharging
D、Rate of loading
查看答案

正确答案
B

试题解析

感兴趣题目
()is the Shipowner’s duty to send the ship to the agreed,or in the absence of special agreement,to the usual place of loading.
When your vessel is on or near the path of an approaching tropical storm the().
()is entitled to enter into,with a shipper,any agreement,stipulation,condition,reservation or exception as to the responsibility and liability of the carrier or the ship for the loss of or damage to,or in connection with,the custody and care and handling of the goods prior to the loading on,and subsequent to the discharge from,the ship on which the goods are carried by sea.
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().
Every deliberate act of wrongdoing by the master or any of the crew against the ship or cargo,without the authorization or privity of the Shipowner or his agent,is().
(), or drum is used for hauling in or letting out the wires or ropes which will fasten the ship to the shore.
When loading or discharging dry mud or cement,crew members should use goggles and().
The schedule management plan is a component of the project management plan. The Schedule management plan maybe formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
The schedule management plan is a component of the project management plan The schedule management plan may be formal or informal, highly detailed or broadly framed, based upon the()of the project, and includes appropriate control thresholds.
During counterflooding to correct a severe list or trim aggravated by an off-center load,a ship suddenly takes a list or trim to the opposite side. You should().
The third officer’s duty is to()when vessel is commanded under the pilot or captain.
相关题目
_____ed ucation is the instruction that occurs when the instructor and studen t s are separated by distance or time,or both.
The manager or his assistant ______ planning to go
1_____education is the instruction that occurs when the instructor and students are separated by distance or time,or both
When the Pilot is embarked he or she ().
When the pilot is embarked he or she().
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
When a vessel sees the other ahead or nearly ahead,by night she could see the masthead lights of the other in a line or nearly in a line or both side lights,()shall be deemed to exist.
During loading or discharging,where the delay is due to the Shipowner’s fault,or that of his servants or agents acting within their authority,the time actually delayed is to be()in calculating lay days.
Lay days()to commence after the expiry of a specified time after the giving of the notice of readiness to load or discharge.
The ship will be responsible for the cargo loaded or unloaded().
A ship is responsible for the cargo loaded or unloaded().
The ship will be responsible for the cargo loaded or unloaded().
The carrier is liable for loss of or damage to the goods or delay in delivery caused by fire,()the claimant proves that the fire arose from fault or neglect on the part of the carrier,his servants or agents.
Keeping the draft at or below the load line mark will insure that the vessel has adequate().
Any friction fit, tightness or adhesion of the part of any load being lifted should be broken by wedge or tapping and not by increasing the load on the applianceAccording to this sentence, ()
The()enables water to be blow down or emptied from the boilerIt may be used when partially or completely emptying the boiler.
The guard, fencing or shielding for moving parts or machinery can be removed for repair only when the machinery it belongs to()
The()provides a rapid means of tallying when items of the same commodity are being loaded or unloaded in uniform drafts consisting of an equal number of pieces.
Notice of readingness to load must be served()the charterer or his agent.
Notice of Readiness to Load must be served()the Charterer or his agent.
广告位招租WX:84302438

免费的网站请分享给朋友吧